I read it a few times and thought you must have meant community vote as per post #300. Wondering if post #297 onward could be split off to give Joe his thread back?
Looking forward to seeing what commercial interest there might be after you put the feelers out.
yes yes confirmed.
Will do, was hoping some of you lot would want to get more involved and man the organizing/setting up?, someone to "take the reins" as they say would be nice.
I cant do everything, all at the same time. Wish I was an octopus i've got that much going on, if no one wants to lead the way on this then it will just be something I do at my own leisure.
I'm still not well at all so the last thing I need right now is more things to stress about, I'd much rather wait and fully enjoy the endeavour.
.
Small update: https://vimeo.com/194115391
Sent from my iPhone using Tapatalk
It's alive, well nearly :thumsup: Always nice to see it move
Yes, great moment when something moves under power! Now, if you can sync two cordless drills for testing master plus slave axes...
Edit - just flicked back and see you are using the long-belt sync method. Saves requirement for synchronised cordless drills :smile:
I always fancied using my router like an etch-a-sketch with drills 😁 Well done Joe, its getting better and better...
Sent from my HUAWEI VNS-L31 using Tapatalk
Sorry Joe just looking back at your build and didn't see these questions. So here goes.
Yes still want fault signals in E-stop. What I meant was use another contact on the Relay and run 24V thru it which then turns on Mains Contactor.
Only the Shield of the Motor cable and only the control box end needs grounding to Star point. To save wasting wire and stripping insulation back so shield wire reachs star point and drives just run single wire from Star point to point near drives and solder to the Shields or use connector block.
The Earth wire on the Plug and the Star point should be the same thing, that's the whole idea. You have one Point that the main Earth comes into which is then distributed to all that need Earth. You also take all shields back to this point.
So in this case if the VFD is in the main Control box case (which personally I don't like) and turns on with control box you would take to Star earth point.
The shield for Spindle cable is best or easier if connected to the Earth Terminal in VFD.
If the VFD is external then just use the cables earth wire back to Plug. Same connection as above applies with shield.
IP-M Earth goes to the Star point.
Thanks Dean. I will digest this and revisit the circuit diagram. No doubt there will be more questions! I would also like to pick your brains on the power supply if possible...
http://uploads.tapatalk-cdn.com/2016...67f6fc4381.jpg http://uploads.tapatalk-cdn.com/2016...663bd2960a.jpg
belt tensioner pulleys are in.
Sent from my iPhone using Tapatalk