You forgot diagonals when looking in the plan view, see here what I mean; http://www.mycncuk.com/threads/6565-...2425#post52425
Printable View
You forgot diagonals when looking in the plan view, see here what I mean; http://www.mycncuk.com/threads/6565-...2425#post52425
Thank you cropwell i will look more into this.
cheers
if only you could get the steel this clean lol, anyways i know i did this all before but ive done a few tweaks but i am a little concerned with the gantry side plates being so wide and because the aluminium gantry beam is pushed to the back it leaves a large space on the flange plates. this is because i was reading about not having the z axis over hanging and to have the gantry side plates in front of the z axis.
I have gone with 100x100x5mm all round for the frame
all plates are 20mm thick aluminium
linear rails 25mm
ballscrews r2010 driven on both sides with nema 23's 4nm and a rotating ball nut due to long 3000mm ballscrews
still thinking for the rest but whats your thoughts?
Attachment 23352
Attachment 23353
Attachment 23354
is £400 the going rate for 3 meter ballscrews r2010?
noob question here with it being the first time tapping a hole my self if the linear rails holes are 4.5mm what would the tap size be to the aluminium plate its attaching to?
If the holes really are 4.5 mm diameter in the rail they are expecting you to use M4 cap head bolts to allow some adjustment. You need a 3.3 mm drill for the pilot drill, followed by an M4 x 0.7 pitch tap (coarse thread).
But I would expect a 25 mm rail to use M6 cap heads? If so these would need a 5mm pilot hole then an M6 x 1 pitch tap (coarse thread).
What's with the parquet bed?!
Sent from my iPhone using Tapatalk