. .

Hybrid View

Previous Post Previous Post   Next Post Next Post
  1. #1
    So,

    New ballscrews have arrived, TBI motion ground 2005 with double nuts. These ballscrews have BK15 mounts at both ends rather than a floating end and each BK15 holder, four in total, has a pair of Japanese 7002 angular contact bearings. These parts were bought lightly used from the same seller that I bought a lot of the other parts from in South Korea, but are clearly much better than the Chinese ones that I'm going to pull off the Y axis. One of these screws will be on each side of the Y axis as before so it should improve the smoothness of motion and the extra thickness of the screw (going from 16mm to 20mm) should enable me to increase the speed of the rapid movements a little without encountering whipping.

    Click image for larger version. 

Name:	Ballscrew.jpg 
Views:	226 
Size:	72.4 KB 
ID:	27781

    The only downside of the change so far is that I've lost a bit of travel on the Y axis, down from just over 1100mm to just over 1000mm. I'd rather have the piece of mind of these motion parts than the extra cutting envelope so I'm okay with it.

    As a result I've needed to redesign a few parts though. As per Jazz suggestion I've added a new bracing for the gantry which will tie in to the Y axis linear bearing plates. This part only braces towards the back side of the gantry, as the new ball-screw connection will be made to the front side via a plate as shown below. I might figure out something for the front too at a later date.

    Click image for larger version. 

Name:	Gantry_Brace.png 
Views:	214 
Size:	89.2 KB 
ID:	27779

    I've designed some new shoes for the ballscrews to fix to to mate them with the Y axis profiles.

    Click image for larger version. 

Name:	CNC Ballscrew Feet.png 
Views:	204 
Size:	113.5 KB 
ID:	27778

    I've also rethought the design for connecting the ballscrew to the Gantry. I was never too happy with the previous welded solution, they were a mess.

    Click image for larger version. 

Name:	Ballscrew_Mount.png 
Views:	209 
Size:	53.0 KB 
ID:	27777

    Lastly, since I've moved up to a larger screw my motor mounts have to change too. These attach to the end of the Y profile on each side and carry the Y motors.

    Click image for larger version. 

Name:	Motor_Mount.png 
Views:	211 
Size:	81.3 KB 
ID:	27780

    Since I can't buy materials at the minute I've decided to try to get all of these laser cut in the UK and shipped over. The company are running but with minimal staff so it might take a while to organise.

    Gantry to ballscrew mating part will be made of 15mm mild steel laser cut and I'll paint that later. The rest will be laser cut from 10mm stainless steel. That's the plan at the moment, it's hard to get companies to do much at the moment so we'll have to see.
    Last edited by Evengravy; 10-04-2020 at 09:47 AM.

  2. #2
    Don't understand why you are making the Y ball screw plate and the brace plate separate.? This could be made as one piece and will be stiffer and easier to fit.!

  3. #3
    Quote Originally Posted by JAZZCNC View Post
    Don't understand why you are making the Y ball screw plate and the brace plate separate.? This could be made as one piece and will be stiffer and easier to fit.!
    Hey,

    I designed it this way just to give me scope for adjustments in each degree of freedom. I couldn't think of a better way of doing it to be honest, open to suggestions though.

    I could get both parts made up from mild/bright steel and once everything is lined up get the joints welded. I picked up my MIG today and dusted it off, maybe I can get good enough with some practice to get it done myself.

    Click image for larger version. 

Name:	Assembly_Render 2.png 
Views:	296 
Size:	94.7 KB 
ID:	27785

    Also there's scope to brace between the front and side section with some triangulated pieces.

    Click image for larger version. 

Name:	Assembly_Render.png 
Views:	261 
Size:	69.0 KB 
ID:	27786

    Honestly not too clear how I could make it in one piece, but I'm probably being blonde...it's been known to happen.

  4. #4
    Quote Originally Posted by Evengravy View Post
    Hey,

    I designed it this way just to give me scope for adjustments in each degree of freedom. I couldn't think of a better way of doing it to be honest, open to suggestions though.
    Ah makes a bit more sense now. I was working on your old setup and seeing all those holes which matched the profile ends I thought was fastening into ends.

    Carry on.!! . . Lol

    Edit: The drop bracket still needs some bracing thou.!! or a redesign of the whole thing.!.
    Last edited by JAZZCNC; 10-04-2020 at 05:58 PM.

  5. #5
    Quote Originally Posted by JAZZCNC View Post

    Edit: The drop bracket still needs some bracing thou.!! or a redesign of the whole thing.!.
    Yea, I was planning some welded triangulation braces between the two parts once it's all aligned properly, the overhanging section that mates with the ballscrew is annoying me but I'll come up with something to strengthen it up. Front plate will be heavy (15mm) but I know that will be a weak spot for flex. I'll play around with the design a bit more in CAD.

  6. #6
    Quote Originally Posted by JAZZCNC View Post
    Edit: The drop bracket still needs some bracing thou.!! or a redesign of the whole thing.!.
    Hey, so I've decided to go back to my existing design of the gantry to Y ballscrew connection which was 10mm steel plate welded and braced with 10mm triangular plate sections. After testing this arrangement on the Chinese screws for play, measured at the tool with my dial indicators I'm quite happy with it strength wise so I have redesigned the same arrangement to fit the new ball-screws. The current layout has between 0.02mm and 0.03mm of play which is largely coming from the ballscrew nuts themselves, you can feel a good bit of play by hand in the ball nuts when these are off the machine which does tighten up significantly when both screws are in the machine (weirdly), but I definitely got unlucky with these Chinese ball-screws compared to what others seem to get. There's noticeable bends in them too so out they go. Bare in mind the current ballscrews are running with angular contact bearings in the BK12 holders, which I bought after the fact, so those bearings tighten up the play in the Y. Initially play was in the order of 0.1mm+ in my measurements before and fitting angular contact bearings. I can't feel any play at all by hand in the new ground ball-screws so I'm confident they'll be a big improvement.

    One catch with the new design is that I'll need to machine a ball-screw nut mount for the new ball-screw, one each side. Would anyone here be able to machine this part for me (x2) out of Aluminium for payment? I'd rather spread work here than a bureau service if anyone is free/able/willing.

    I don't think my Momus will be accurate enough to do it to this depth to be honest, there's just too much play in the Z (part is roughly 57mm x 65mm x 70mm from Ali (6061/6082 etc))

    Failing that I'll have to consider milling it in thinner 25mm sections bolted together until I can machine it myself from a single piece when the machine is in situ, but I'd rather get it done right the first time if possible.

    I still need to consider the bracing of the gantry to the Y bearing block plates, but I'm happy enough I can do that after the fact pretty simply and am considering an adjustable design there.

    I'm leaning towards setting this up in the standard horizontal arrangement atm, reason being I'm thinking of running high flow flood coolant on it and it's easier to manage that way.
    Attached Thumbnails Attached Thumbnails Click image for larger version. 

Name:	Assembly 4.PNG 
Views:	234 
Size:	96.8 KB 
ID:	27797   Click image for larger version. 

Name:	Assembly 4.1.png 
Views:	232 
Size:	87.2 KB 
ID:	27798   Click image for larger version. 

Name:	Ballscrew_Holder_Tapped.png 
Views:	201 
Size:	143.3 KB 
ID:	27799  
    Last edited by Evengravy; 17-06-2020 at 02:22 PM.

Thread Information

Users Browsing this Thread

There are currently 4 users browsing this thread. (0 members and 4 guests)

Similar Threads

  1. Aluminium profile cnc build
    By valdis034 in forum Gantry/Router Machines & Building
    Replies: 84
    Last Post: 21-02-2023, 02:27 PM
  2. BUILD LOG: First Build - Yet Another Alu Profile Router - 900 x 800
    By CaptainBarnacles in forum DIY Router Build Logs
    Replies: 53
    Last Post: 14-02-2020, 08:16 PM
  3. BUILD LOG: Large aluminium profile build
    By jeronimo in forum DIY Router Build Logs
    Replies: 6
    Last Post: 12-11-2016, 10:02 PM
  4. BUILD LOG: New build - fixed gantry mill using extruded profile
    By toolchimp in forum DIY Router Build Logs
    Replies: 3
    Last Post: 09-11-2012, 04:10 PM
  5. NEW MEMBER: John C, York, UK
    By JohnC in forum New Member Introductions
    Replies: 1
    Last Post: 17-10-2010, 07:03 PM

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •