+1 for the 2 layers of engineering bricks.
I also cast in concrete a 12" L shapped upturn where the shed was lower than the garden. Done at the same time as I extended the concrete base(shed wasnt going to be big enough)
The form work took some planning but no water ingress in 5 years so must be water tight

Peter