So thanks to Dean on this forum i managed to cut out the Aztec calendar.

Unfortunately some small detail was lost due to the MDF tearing a little (really need a better cutter).

Here is what i made:

It took about 2.5hours all in all to make at a feed rate of 2000mm/m