  1. Quote Originally Posted by Iwant1 View Post
    Irving, its amazing how fast you work, from drawings to actually getting started. I suppose when there's something on your mind and you're thinking about it all day, things get done. Keeps the pics coming, its a very interesting thread.

    I'm surprised your other half hasn't told you to keep digging and make a swimming pool instead, lol forget the shed and concentrate on relaxing.
    Well I'm still not 100% sure how to do the next step. I understand the general principles but the detail still needs hammering out. But the winter approaches rapidly and so I thought I'd make a start on the hardest bit... before SWMBO realised exactly how big it was going to be :). I have to say I am quite proud of my hole.. but I need to get on and fill it. Problem is I can't be home to accept deliveries, I need to be at work (I sort of managed to scrounge some extra days last week by agreeing to be on call over Xmas, but I am now all out of holiday till next Jan) and most places don't deliver Saturdays. So I can work from home some days but the logistics are complex! And I really only have weekends to work - those that are not already allocated to family stuff. So next weekend I hope to finish the shuttering (didn't get any movement on this this weekend as I'd hoped) and, by then, have ordered the ballast, sand, DPM, reinforcing mesh and insulation. I don't have room in the garage to work on the shuttering, it has to be done outside on the patio :(

    So the following weekend will be preperation work and hopefully I can get a concrete pour during the following week - 2 weeks out. Then I have to wait at least 14, pref 28, days before I can start on the walls, but that gives me time to order them and the roofing stuff. Once all thats in place I can work on the inside through November and do some evenings so it'll go faster. I'll leave the external cladding and tidying as long as possible... maybe into next spring lol.

  2. Well best laid plans etc....

    The hole is still there, though its now doing a very poor impression of a swimming pool filled with porridge.

    I was rushed with the digger and hadn't realised it was 100mm narrower than I needed and a little wasp waisted. Fortunately being relatively soft due to the water content I've managed to tidy up the edges and now its sides are parallel, vertical and the correct distance apart and I have dug the post holes for the 4 x 3 posts that will hold the retaining wall at the back. That'll be made of 4.2m long 225 x 50 (9 x 2) boards.

    In the meantime I have finally completed the design of the steelwork needed in the concrete. Why do I need steelwork, isn't that a bit overkill I hear you ask? Well maybe if you dont care about cracks appearing in a couple of years time, but I want this to last 20years and still be stable and because its on a clay base and near a tree it has to cope with heave and shrinkage. The normal solution to that is to dig deep piling into the clay, about 4 - 5m deep or more and suspend the raft on top. Thats not an option for me, so the alternate is to build a concrete raft thats sufficiently strong to stand the lifting forces and also support itself if the clay shrinks from underneath a section of it.

    The research into how to design such a raft has been interesting, there's surprisingly little info. A civil engineering graduate son of a friend said that it wasnt something they covered in his Uni course. But I have persevered and have now a design that meets the demands of BS8110 and I am confident it'll handle pretty much anything. It does come at a cost of £400-odd of extra steel but that was 1/2 the cost of the extra concrete needed in an alternate approach (not forgetting the need to dig the hole deeper as well).

    It does make me wonder just how good a job the companies that estimated this work for me would have done. Yes they might have finished now, but the life-expectancy of the work would have been severely compromised. One wasnt using any steel at all ("not needed") and the other said "oh we'll throw some in if you want".

    Here's a Sketchup of the steelwork... all 418kg of it!

    Click image for larger version. 

Name:	basic_base with steel.png 
Views:	207 
Size:	554.6 KB 
ID:	7031
    Last edited by irving2008; 02-10-2012 at 10:19 PM.

  3. OK, so having stared at my swimming pool/hole for a few days, I tried to work in it this weekend... after an hour of struggling in the porridge I gave up. I now have some inkling of how the soldiers in the trenches felt about the mud! So i need to empty the water from the hole so it can at least have an attempt at drying out. I need a pump that can handle dirty water, can pump close to the base (a lot can pump down to 4", well its not much deeper than that in places) and can shift around 2500litres in a reasonable time... suggestions? or can anyone lend me one for a couple of weeks?

  4. #94
    Would it help digging a small sump hole in the middle from which to pump?

  5. Quote Originally Posted by WandrinAndy View Post
    Would it help digging a small sump hole in the middle from which to pump?
    Yes, I'd just about figured that idea out myself :) there is actually a sump at one end where i was a bit enthusiastic with the digger but there's a ridge to the other end so I'd have to dig (dredge? lol) a channel...

  6. #96
    I'll see if we got a spare pump at work Irving, can't promise we have one spare but you never know. It'll be though but I have a transformer you could borrow also. If you had asked last week I could have dropped one round as I was working in Hendon this weekend.

  7. Thanks Peter... Mocha has also offered, but its the logistics that always defeat these things... so the more offers the better - let me know if you have one...

    Oh btw , heres the paddling pool of porridge... :(

    Click image for larger version. 

Name:	paddling pool of porridge.jpg 
Views:	219 
Size:	263.7 KB 
ID:	7088

    hmmm... not sure where to send the water... the nearest drain/sewer is about 10m or so towards the camera... it cant go left or back as thats uphill... and right means flooding the back of the neighbours garden.... so drain/sewer it is... so I'll need some 10m or so of 1.5" or 2" flat hose or whatever the pump takes...

  8. #98
    You don't need 2" for that little amount, some 1/2" hose on a little hippo pump would clear that in 30 mins and easily keep up with any incoming. A 2" pump would drain that lot in probably 2 minutes.

  9. Quote Originally Posted by Peter. View Post
    You don't need 2" for that little amount, some 1/2" hose on a little hippo pump would clear that in 30 mins and easily keep up with any incoming. A 2" pump would drain that lot in probably 2 minutes.
    Thanks Peter.... I just know that filling a paddling pool with a 1/2 hose takes forever lol :)....

  10. #100
    Small hippo would empty that easily and pump it 10mts to the drain. My small hippo can take a 40mm id hose. Empties my 2000 gallon fish pond in around 1 hour.

Page 10 of 11 FirstFirst ... 891011 LastLast

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Similar Threads

  1. Building 2nd machine smaller one
    By Timo in forum Gantry/Router Machines & Building
    Replies: 6
    Last Post: 10-06-2014, 03:10 AM
  2. Thinking of buying/building machine for PCB milling
    By njh in forum Marketplace Discussion
    Replies: 32
    Last Post: 11-10-2013, 07:35 PM
  3. New Workshop
    By Washout in forum Workshop & Equipment
    Replies: 13
    Last Post: 26-12-2012, 10:22 PM
  4. NEW MEMBER: CNC and other Machine Building Berlin
    By Andikid in forum New Member Introductions
    Replies: 1
    Last Post: 07-10-2010, 11:30 PM

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •