. .
Page 11 of 11 FirstFirst ... 91011
  1. Mocha's Hippo is doing well .. three hours (limiting factor was the 1/2 inch hose cobbled together with duct tape) and it looks like this:

    Click image for larger version. 

Name:	Nearly empty.jpg 
Views:	315 
Size:	211.8 KB 
ID:	7108

    need to move it to the back to shift the remainder...

  2. #102
    D.C.'s Avatar
    Lives in Birmingham, United Kingdom. Last Activity: 05-01-2016 Has been a member for 9-10 years. Has a total post count of 326. Received thanks 30 times, giving thanks to others 24 times.
    If you are doing a lot of groundworks anyway you might to dump a load of tubing down there and do a ground source air pump.

  3. Quote Originally Posted by D.C. View Post
    If you are doing a lot of groundworks anyway you might to dump a load of tubing down there and do a ground source air pump.
    Thanks. Interesting idea, but the additional depth I would need to dig, some of the regs and the need for planning permission make it a non-starter...

Page 11 of 11 FirstFirst ... 91011

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Similar Threads

  1. Building 2nd machine smaller one
    By Timo in forum Gantry/Router Machines & Building
    Replies: 6
    Last Post: 10-06-2014, 03:10 AM
  2. Thinking of buying/building machine for PCB milling
    By njh in forum Marketplace Discussion
    Replies: 32
    Last Post: 11-10-2013, 07:35 PM
  3. New Workshop
    By Washout in forum Workshop & Equipment
    Replies: 13
    Last Post: 26-12-2012, 10:22 PM
  4. NEW MEMBER: CNC and other Machine Building Berlin
    By Andikid in forum New Member Introductions
    Replies: 1
    Last Post: 07-10-2010, 11:30 PM

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •