The other end is floating inside a bearing which is pressed into the gantry extrusion. I thought about welding a new end onto the side that is not driven, then maching this side to take the bearing block. That way the thrust bearing will be on the "wrong" side of the screw but it would mean less mods to the router as it stands. What do you think?