. .

Threaded View

Previous Post Previous Post   Next Post Next Post
  1. #21
    Obviously section 1.10 of the Hiwin manual is the 'correct' method but if you don't have the gear . . .
    To mount rails similar to yours, I first clamped a straight edge along the top with the edge parallel to the beam and for the Hiwin rail to be in the centre.
    Then I clamped the Hiwin rail to the beam making sure it was tight up against the straight edge. The holes in the rail are about 5.5mm diameter so I used a 5.5mm drill in every mounting hole to make a dimple in the epoxy similar to using a centre punch. This allowed my 4.2mm tapping drill to go right through the epoxy and beam, all central to the Hiwin mounting holes. The other rail was mounted in a similar way but using a DTI gauge to keep them parallel.
    Last edited by EddyCurrent; 10-02-2014 at 02:54 PM.
    Spelling mistakes are not intentional, I only seem to see them some time after I've posted

  2. The Following 2 Users Say Thank You to EddyCurrent For This Useful Post:


Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Similar Threads

  1. BUILD LOG: Steel frame cnc router design/build
    By CraftyGeek in forum DIY Router Build Logs
    Replies: 110
    Last Post: 06-05-2015, 10:00 PM
  2. BUILD LOG: First steel diy CNC router build
    By ivars211 in forum DIY Router Build Logs
    Replies: 59
    Last Post: 28-07-2014, 08:29 PM
  3. Replies: 41
    Last Post: 08-02-2014, 11:37 PM
  4. A Sturdy Steel Framed Machine Design
    By Boyan Silyavski in forum Machine Frames & Beds
    Replies: 0
    Last Post: 06-11-2013, 05:58 PM
  5. BUILD LOG: 7' X 4' Steel frame build
    By Ricardoco in forum DIY Router Build Logs
    Replies: 6
    Last Post: 28-10-2012, 06:02 PM

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •