Cheers, i was thinking the same, its a shame they did not store it inside, and i will have to strip down all the electric to make sure they are dry prior to powering it, everything apart from the drivers and controllers ( spindle, motors, barings, hydro connections and cnccontroller ), has been exposed to the elements for at least a few months.

a upgrade of main parts is looking like 5-6k, and maybe 5 days.

So will decide in morning, its still worth it for the right price

so, will see what deal there is to be done tomorrow afternoon