  1. #81
    Ahhh...ok I get it now....said I was being thick!! I know v little about plasma cutters....and it shows!!
    Neil...

    Build log...here

  2. #82
    Little bit slower now, onto the small fiddly bits....

    Got the Axis hard-stops and beam end-covers designed, cut and fitted..



    Fitted the floating head, torch mount and probe/limit switches...



    The front Y & A axis limit/home switches...



    And the Y far-end limit switch...



    Started work on fitting the cable chain to the X axis now.

  3. #83
    Looking good, it's the little bits that seem to take the most time....
    Neil...

    Build log...here

  4. #84
    Looking sweet Dave, nice bit of metal work there!
    .Me

  5. #85
    Thanks,

    another slow day today, had a few orders to make then fitted the cable tracks and trunking and started planning out the bed support frame.

  6. #86
    had a couple of hours today, fitted the last of the limit switches and started on the slat support frame.

    I thought a seperate frame would be best to avoid putting any heat into the side frames and make replacement easy.

    50 40 x 5mm angle fitted into bed opening and a strip fitted to its bottom edge to support the slats vertically.



    Quite disappointingly when i did the heavy tacks to secure the bottom return strips, the angle warped and is now 4mm high in the middle

    Not good, not sure what to do about it - ignore it and let the THC tackle it, maybe slit the angles vertically in two or three places, press it flat and weld up or something else.

    I didn't think angle that heavy would warp!

    Apart from that it s all going to plan

  7. #87
    Slat bed fitted at last, total PITA




    Not 100% happy with it as the 50x3mm strip i ordered is a range of anything between 48x3 and 52x3 !
    Will be changing it some time soon i think.

    I also fixed the warped slat rails very nicely -



    A quick slice with a 2mm disc and weld-up, now it sits perfectly flat on the side beams

    The vertical weld was also my first vertical-up weld as i'm normally a bench top welder, didn't come out too bad i thought

    Stripped it all for paint now, hopefully the weather will be good tomorrow.

  8. #88
    Feeling a bit blue today...

    Gantry...



    Main frame...



    Had to repaint the side beams as i forgot to fit the dust shields for the HiWin rails, probably not too important as the blocks have hard scrapers and extra seals fitted on all ends

    Now to start rebuilding and final fitting.

  9. #89
    Extract tray / chamber arrived today...



    Quality is excellent, glad i outsourced this part

  10. #90
    Looking good Dave, coming together nicely!
    Neil...

    Build log...here

Page 9 of 12 FirstFirst ... 7891011 ... LastLast

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Similar Threads

  1. New Build-12x6ft Plasma Table
    By F1transportationserv in forum Plasma Table Machines
    Replies: 23
    Last Post: 04-07-2015, 12:14 AM
  2. Plasma table build, first question....
    By Davek0974 in forum Plasma Table Machines
    Replies: 51
    Last Post: 01-08-2014, 03:11 PM
  3. 4' x 4' plasma table build in Canada
    By 190-v8 in forum Plasma Table Machines
    Replies: 0
    Last Post: 29-01-2014, 12:27 AM
  4. BUILD LOG: Let The Fun Begain, New build on the Table.
    By Bush Flyer in forum DIY Router Build Logs
    Replies: 63
    Last Post: 20-11-2013, 09:19 PM
  5. 3M x 2M Plasma table build
    By MonoNeuron in forum DIY Plasma Build Logs
    Replies: 14
    Last Post: 01-09-2009, 11:11 AM

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •