  1. #91
    Here is a cutaway view of the spindle showing housing, bearings, draw bar and collet system. At the top you can see the pulleys for the drive and the belleville washers which hold the tool in place by pulling up the R8 collet
    I to am following this with interest. Have you decided on the size and number of the bellevilles? Also could you give more details on the drive arrangement for the PDB as I am making one for my mill but using an intensifier (small jack) to give a 7:1 advantage with 12 belleville washers. From a post on the Zone by SDM
    ..Clive
    The more you know, The better you know, How little you know

  2. #92
    Quote Originally Posted by Clive S View Post
    I to am following this with interest. Have you decided on the size and number of the bellevilles? Also could you give more details on the drive arrangement for the PDB as I am making one for my mill but using an intensifier (small jack) to give a 7:1 advantage with 12 belleville washers. From a post on the Zone by SDM
    Hi Clive,
    I'm only 50/50 on making the spindle+PDB as it is quite a risky project, and could well end up just using the WC spindle as direct drive. But in terms of spec for the PDB system I've not finalised on all the details. It does seem quite hard to find definitive numbers on things like tool pre-load.

    I'm away from my home PC at the moment, where all the data is, but from memory I'd put in the same number as the Tormach PDB kit shows (~6?) since I would be using the same R8 collet style. I've read that the load applied using the Tormach PDB kit is OK for general work but could be on the low side and an aggressive cut could pull it out of the taper, so I could need more. They don't want to share the spec details (understandable) for the bellevilles so no more data than this. I can add more than this without a problem.

    I've downloaded a calculator to work out loads depending on series or parallel arrangements and also give the total travel until it bottoms out. This is where the tricky bit is to ensure the loads and travel all work out.
    I had allowed for 10mm total travel of the drawbar to release the tool, of which 6mm is used to remove the pre-load off the taper, and the remaining 4mm is to push it out and hopefully release the tool.

    The mechanical drive system needs a lot of force/torque, so the 7:1 jack you are thinking of is a good start. I currently have a geared down stepper driving a 1605 ballscrew. I did look at a 1204 screw to get more ratio but the axial forces are very high and I didn't want go that route in the end. Again from memory it needed at least 8 Nm to turn the ballscrew. That's all I have for now.
    Building a CNC machine to make a better one since 2010 . . .
    MK1 (1st photo), MK2, MK3, MK4

  3. #93
    I've downloaded a calculator to work out loads depending on series or parallel arrangements and also give the total travel until it bottoms out. This is where the tricky bit is to ensure the loads and travel all work out.
    I had allowed for 10mm total travel of the drawbar to release the tool, of which 6mm is used to remove the pre-load off the taper, and the remaining 4mm is to push it out and hopefully release the tool.
    Thanks for the info. From what I have read (and I am no engineer) a R8 collet requires a holding force of about 2400 lbs to be safe. I am using part No. D2315162 washers from Belleville Springs 2 in P and 6 in S this give a free stack height of 28.5mm and a flat height of 24mm. 75% deflection height is 25.13 mm with a load of 12337N.

    The guy on the zone recons 0.5mm will release the collet after the pre-load has gone.
    The setup requires about 180Kg on the jack to give me 1260kg

    I would be interested in the link for the calculator
    ..Clive
    The more you know, The better you know, How little you know

  4. #94
    Quote Originally Posted by Clive S View Post
    Thanks for the info. From what I have read (and I am no engineer) a R8 collet requires a holding force of about 2400 lbs to be safe. I am using part No. D2315162 washers from Belleville Springs 2 in P and 6 in S this give a free stack height of 28.5mm and a flat height of 24mm. 75% deflection height is 25.13 mm with a load of 12337N.

    The guy on the zone recons 0.5mm will release the collet after the pre-load has gone.
    The setup requires about 180Kg on the jack to give me 1260kg

    I would be interested in the link for the calculator
    Hi Clive,
    I got the info together last night but no time to post out. Similar to your findings.

    R8 needs 2500 lbf (11,000 N or 1,100 kgf) to hold it, maybe a bit more to be safe
    Used calculator on this website:
    http://www.meadinfo.org/2009/07/bell...ck-design.html

    Used washers (())(( to get 15,000 N when flat.

    Release distance was about 0.3mm (between holding load and flat load).

    Looked at data on this site:
    http://www.leespring.co.uk/browse_ca...=&pageNumber=8
    part 500-125-1125

    This was a quick look, I think it could be refined.
    Last edited by routercnc; 16-03-2017 at 05:03 PM.
    Building a CNC machine to make a better one since 2010 . . .
    MK1 (1st photo), MK2, MK3, MK4

  5. #95
    Mini update -

    Cut out the 3rd bracing piece:
    Click image for larger version. 

Name:	IMG_5934.jpg 
Views:	248 
Size:	199.6 KB 
ID:	21222

    Final one under way:
    Click image for larger version. 

Name:	IMG_5936.jpg 
Views:	238 
Size:	307.7 KB 
ID:	21223

    All 4 profile ops done:
    Click image for larger version. 

Name:	IMG_5937.jpg 
Views:	245 
Size:	174.4 KB 
ID:	21224

    Then onto the side ops. I need to machine several side features starting with 2off 6.8 pilot holes (to later take an M8 thread). Bit nervous as I'm trialling fusion 360 for the first time as it can do these pilot holes as spiral bores. Done a few aircuts and all seems OK from a cutting point of view (apart from that G28 as mentioned in another post).

    Here is the fixture:
    Click image for larger version. 

Name:	IMG_5960.jpg 
Views:	270 
Size:	260.2 KB 
ID:	21225

    Luckily I had planned ahead (!?) and the first triangular brace I made with the poor surface finish could be used as a support. It will be sacrificial as one of the ops will cut into it.
    The vertical angle is held by the precision vice, with a backstop at one end. The part just drops in and is then clamped. I was just about to hit cycle start and I was called away ! So it will have to wait . . . .
    Building a CNC machine to make a better one since 2010 . . .
    MK1 (1st photo), MK2, MK3, MK4

  6. #96
    I've been busy with other projects but back on it again and ready for some updates. I've had to re-read the last few posts so see where I'd left off so apologies if I repeat something.
    Last time I left you in suspense over the holes in the side of the bracing pieces. Here they are being machined:
    Click image for larger version. 

Name:	IMG_5964.jpg 
Views:	229 
Size:	281.7 KB 
ID:	21557

    All 4 pieces machined:
    Click image for larger version. 

Name:	IMG_5965.jpg 
Views:	193 
Size:	121.2 KB 
ID:	21558

    Two of the holes need to be M8 tapped, and one is a clearance + counterbore. Here is the counterbore being done.
    Click image for larger version. 

Name:	IMG_5967.jpg 
Views:	209 
Size:	279.9 KB 
ID:	21559

    Bit nerve racking for 2 reasons. Firstly the pilot hole was machined blind on the other side, so I had to hope I'd got it all lined up so that the counterbore appeared in line with the hole. As you can see it was all OK:
    Click image for larger version. 

Name:	IMG_5975.jpg 
Views:	193 
Size:	237.0 KB 
ID:	21560

    Secondly, part was a bit close to the chuck. I'd measured it and knew it would clear. Clearance is clearance as they say but still glad it went OK. . . .
    Click image for larger version. 

Name:	IMG_5973.jpg 
Views:	211 
Size:	323.9 KB 
ID:	21561

    Then tapping the M8 holes on the bottom:
    Click image for larger version. 

Name:	IMG_5978.jpg 
Views:	184 
Size:	207.6 KB 
ID:	21563

    All 4 parts done:
    Click image for larger version. 

Name:	IMG_5977.jpg 
Views:	215 
Size:	197.5 KB 
ID:	21562

    _____________________________
    Then back to the side panels. They needed holes on the sides which is always a bit more awkward. Got them dialled in:
    Click image for larger version. 

Name:	IMG_6008.jpg 
Views:	227 
Size:	249.9 KB 
ID:	21564
    Click image for larger version. 

Name:	IMG_6010.jpg 
Views:	197 
Size:	210.1 KB 
ID:	21565

    Machined the holes and noticed that the top edge had a slight climb to it across the width with one edge 0.05 higher than the other. I guess this is reaching the limit of my current machine when cutting out a profile. So I took a very light skim to get it square again. This needs to be square to make the whole box square:
    Click image for larger version. 

Name:	IMG_6013.jpg 
Views:	231 
Size:	272.6 KB 
ID:	21566

    Repeated for the other one, then placed them machined edge side down onto an assumed good reference surface (lathe cross slide) to get them level with each other and then clamped them together:
    Click image for larger version. 

Name:	IMG_6014.jpg 
Views:	180 
Size:	199.7 KB 
ID:	21567

    Then machined the other edge, by taking a minute skim off, and then machined out the holes:
    Click image for larger version. 

Name:	IMG_6019.jpg 
Views:	208 
Size:	280.2 KB 
ID:	21568

    Then tapped the M8 holes:
    Click image for larger version. 

Name:	IMG_6023.jpg 
Views:	189 
Size:	219.6 KB 
ID:	21569

    Final dry fit of everything:
    Click image for larger version. 

Name:	IMG_6026.jpg 
Views:	241 
Size:	254.5 KB 
ID:	21570

    More to follow . . .
    Building a CNC machine to make a better one since 2010 . . .
    MK1 (1st photo), MK2, MK3, MK4

  7. #97
    The tram plates also needed holes in the side. Here was the set up:
    Click image for larger version. 

Name:	IMG_5990.jpg 
Views:	189 
Size:	269.6 KB 
ID:	21571

    These holes needed to go all the way through the part, which is quite wide. The cnc machine can bore about 20mm into the hole, so the rest would need to be drilled out. But I didn't trust the drill not to wander so machined the bores on BOTH sides of the part using this fixture. Then drilled it out on the pillar drill from both sides until it met roughly in the middle. Guaranteed to get a straight hole !
    Click image for larger version. 

Name:	IMG_5992.jpg 
Views:	181 
Size:	188.6 KB 
ID:	21572

    Then counter-bored to hide the cap head and cleaned up:
    Click image for larger version. 

Name:	IMG_5994.jpg 
Views:	183 
Size:	126.2 KB 
ID:	21573

    _________________________________

    Onto the Z stepper mounting plate, which will hold to the 2 stepper motors. First time using Fusion360 so a bit worried about how it would turn out (didn't need to worry as it turned out and have not looked back). Exported the part as an IGES file from my CAD programme and used F360 for the CAM. Very impressed with it. Here is the part to be machined:
    Click image for larger version. 

Name:	toolpaths.jpg 
Views:	173 
Size:	77.4 KB 
ID:	21574

    As you can see I was still using a profile method to cut it out (hangup of using Vectric Cut2D), but have since learnt much better methods.

    Holes:
    Click image for larger version. 

Name:	IMG_6087.jpg 
Views:	198 
Size:	262.2 KB 
ID:	21575

    Profile:
    Click image for larger version. 

Name:	IMG_6091.jpg 
Views:	204 
Size:	275.6 KB 
ID:	21576

    Stepper holes drilled and tapped, and done:
    Click image for larger version. 

Name:	IMG_6093.jpg 
Views:	184 
Size:	271.9 KB 
ID:	21577

    More to follow . . .
    Building a CNC machine to make a better one since 2010 . . .
    MK1 (1st photo), MK2, MK3, MK4

  8. #98
    Next up was a little job I'd been putting off until I'd got to grips with F360. These are going to be inserts which fit inside the extrusion to connect the bed uprights. I'm sure there are many ways to make these parts but I decided to get some practice on adaptive tool paths. Here is the first of 16 parts:
    Click image for larger version. 

Name:	IMG_6129.jpg 
Views:	187 
Size:	106.0 KB 
ID:	21583

    It all started with a large 8mm sheet:
    Click image for larger version. 

Name:	IMG_6096.jpg 
Views:	201 
Size:	240.6 KB 
ID:	21581

    I then machined 2 edges so that the parts would be the right length:
    Click image for larger version. 

Name:	IMG_6097.jpg 
Views:	207 
Size:	259.6 KB 
ID:	21582

    Then over to the chop saw to rough them out to width:
    Click image for larger version. 

Name:	IMG_6098.jpg 
Views:	170 
Size:	236.4 KB 
ID:	21584

    Click image for larger version. 

Name:	IMG_6100.jpg 
Views:	171 
Size:	208.0 KB 
ID:	21585

    Next part tool a while - machining the 3rd edge on each part in turn:
    Click image for larger version. 

Name:	IMG_6101.jpg 
Views:	184 
Size:	227.4 KB 
ID:	21586

    Not sure if this is good practice or not but the 4th edge I did in small batches:
    Click image for larger version. 

Name:	IMG_6106.jpg 
Views:	171 
Size:	281.6 KB 
ID:	21587

    All to size . . .
    Click image for larger version. 

Name:	IMG_6107.jpg 
Views:	190 
Size:	215.8 KB 
ID:	21588

    Then 6.8 mm holes machined (ready for M8 tap):
    Click image for larger version. 

Name:	IMG_6108.jpg 
Views:	183 
Size:	256.4 KB 
ID:	21589Click image for larger version. 

Name:	IMG_6121.jpg 
Views:	194 
Size:	186.3 KB 
ID:	21590

    Now onto the angled sides. I made a fixture to hold the parts which had 2 datums for alignment:
    Click image for larger version. 

Name:	IMG_6125.jpg 
Views:	201 
Size:	310.6 KB 
ID:	21591
    Click image for larger version. 

Name:	IMG_6128.jpg 
Views:	163 
Size:	211.3 KB 
ID:	21593
    Click image for larger version. 

Name:	IMG_6126.jpg 
Views:	189 
Size:	366.5 KB 
ID:	21592

    The fixture was dropped into the vice each time and aligned in Y (fore/aft) by eye as this is not critical. It only needed to hold the blank in the correct X (left to right) and Z (up and down) position.

    Then a 2D adaptive to rough it out. I had intended to do a cleanup but this doubled the machining time and the parts fitted fine with just the roughing:
    Click image for larger version. 

Name:	IMG_6127.jpg 
Views:	196 
Size:	287.7 KB 
ID:	21594

    The adaptive took about 2.5 minutes which was not too bad. I've done 8 parts, 8 to go . . .
    Building a CNC machine to make a better one since 2010 . . .
    MK1 (1st photo), MK2, MK3, MK4

  9. The Following 3 Users Say Thank You to routercnc For This Useful Post:


  10. #99
    Nice work following with interest
    ..Clive
    The more you know, The better you know, How little you know

  11. Lovely work as usual, well done!

Page 10 of 36 FirstFirst ... 8910111220 ... LastLast

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •