Small update. Ive decided to get longer rails for Z, 700mm, this will arrive in the next two weeks. I am starting to look at building the moulds for the base and gantry systems. I have also ordered the epoxy as well as putty / liquid for levelling that I need.

Hope to provide some updates again soon on this build.