. .

Threaded View

Previous Post Previous Post   Next Post Next Post
  1. #16
    Quote Originally Posted by Kitwn View Post
    This is why you want to screen all the cables and ground them to a single point at the control box/VFD end.
    For emissive cables (steppers, spindle) you should bond the screen at both ends to the respective enclosures.

    <Opens popcorn>
    Last edited by Doddy; 14-07-2019 at 10:13 PM.

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Similar Threads

  1. can Nema 23's be placed inside box tubing X / Y axis
    By Hulksmash in forum General Discussion
    Replies: 9
    Last Post: 27-07-2018, 10:42 PM
  2. L gantry design with 2 aluminium beams bolted with T nuts inside...
    By pierantoine in forum Gantry/Router Machines & Building
    Replies: 2
    Last Post: 30-04-2017, 02:14 PM
  3. Need Help! Gerber System 48 Build Issues Video and Pictures Inside!
    By toby in forum Gantry/Router Machines & Building
    Replies: 16
    Last Post: 14-08-2016, 01:55 PM
  4. editing files inside solidworks
    By reefy86 in forum Solidworks
    Replies: 7
    Last Post: 17-02-2016, 12:20 AM
  5. Inside pics of a 3040 300w DC spindle motor
    By Musht in forum Spindles & Drive Motors
    Replies: 6
    Last Post: 13-09-2015, 07:23 PM

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •