. .

Hybrid View

Previous Post Previous Post   Next Post Next Post
  1. #1
    dsc's Avatar
    Lives in Lincoln, United Kingdom. Last Activity: 17-06-2020 Has been a member for 9-10 years. Has a total post count of 252. Received thanks 1 times, giving thanks to others 11 times.
    Gents,

    this is mostly for the people who used or use Hiwin rails.

    Looking at the Hiwin technical manual:

    http://www.hiwin.com/pdf/lg/QE/QE-Li...ay-%28E%29.pdf

    page 11 , there's a whole section on how to mount the rails and carriages.

    I've seen many machines which use Hiwins and only a few times I've seen the rails mounted against a datum line, even rarer with side plates used for securing the rail. Curious how many of you followed the Hiwin manual and how many simply slap the rails on a flat plate and bolt it when everything is aligned? Am I correct to think the suggested mounting methods are for high loads, not normally seen on home built machines?

    Regards,
    dsc.

  2. #2
    m_c's Avatar
    Lives in East Lothian, United Kingdom. Last Activity: 1 Hour Ago Forum Superstar, has done so much to help others, they deserve a medal. Has been a member for 9-10 years. Has a total post count of 2,909. Received thanks 360 times, giving thanks to others 8 times.
    It's to do with ensuring the blocks/rails can't move, and allows easier assembly.

    Relying on bolts alone means that under high loads (especially shock loads), the blocks/rails could slip. By ensuring they're mounted firmly against an edge ensures they won't move.

    Also by using datum edges, it makes assembly quicker and more accurate. Most machines using linear rails will be getting machined anyway, so adding a datum edge isn't a major issue, and saves quite a bit of time in mounting and adjusting the rails/blocks. For one offs, it's probably not a major benefit, but if you're producing multiples of the same machine, that additional time mounts up.

  3. I always incorporate a datum edge when i build a new machine i have done ever since i built my first machine.. and always used hi-win gear.

  4. #4
    Quote Originally Posted by AdCNC View Post
    I always incorporate a datum edge when i build a new machine i have done ever since i built my first machine.
    Where are they on the first machine, they look well hidden to me...
    http://www.mycncuk.com/forums/router...tempt-cnc.html

    To make a datum/reference edge you need a milling/grinding machine with as much travel as the length of the rail or maybe a long precision straight edge to use as a reference. Either way it's not realistic for the vast majority of people on the forum.
    Last edited by Jonathan; 17-03-2013 at 01:56 AM.
    Old router build log here. New router build log here. Lathe build log here.
    Electric motorbike project here.

  5. #5
    So how do people get around this problem. I'm very interested as I will be facing this problem soon.

  6. #6
    dsc's Avatar
    Lives in Lincoln, United Kingdom. Last Activity: 17-06-2020 Has been a member for 9-10 years. Has a total post count of 252. Received thanks 1 times, giving thanks to others 11 times.
    Gents,

    thank you for the replies.

    Looking at the manual, you can do without having a datum edge for the rails (ie. use the edge of the plate as datum), but the carriages still need a 'lip' and side bolts to secure in place.

    Regards,
    dsc.

  7. Yeh bud, if your milling a datum edge in for locating the rails then the machine your using to mill the datum with will have to be cock-on!

    Regarding the blocks you always mount the rails like this and let the blocks find there own parallelism. So for instance when assembling a z axis mount one rail up agains the datum edge then mount the second, as for when you aline the second rail to the first; mount a bearing block on the first rail thats correctly mounted the attach a magnetic block and gauge to clock the second rail! This is a method of checking if you have milled both rails a datum edge or a way of aligning if you are using a single datum edge. then mount all the blocks and attach the second plate then attach a gauge to this and align this plate to either the first rail or the first plate (taking in consideration that the plates have good milled edges.)

  8. #8
    dsc's Avatar
    Lives in Lincoln, United Kingdom. Last Activity: 17-06-2020 Has been a member for 9-10 years. Has a total post count of 252. Received thanks 1 times, giving thanks to others 11 times.
    That's what I thought Ad (ie. rail against datum and 'floating' carriages), but for whatever reason the manual suggests going the other way, floating rails and fixed carriage.

    Regards,
    dsc.

  9. #9
    dsc's Avatar
    Lives in Lincoln, United Kingdom. Last Activity: 17-06-2020 Has been a member for 9-10 years. Has a total post count of 252. Received thanks 1 times, giving thanks to others 11 times.
    Just a quick question again on the linear rail installation. Hiwin manual shows this:

    Click image for larger version. 

Name:	hiwin_from_manual.PNG 
Views:	419 
Size:	54.9 KB 
ID:	10961

    So master rail bolted, three linear blocks bolted to the axis plate and moving the thing up / down, bolting the second rail at the same time to make sure it's all parallel. This assumes that the two left-hand side linear blocks on the axis plate are in the same line ie. same distance from the edge and the third one is on a line parallel to those.

    I have the master rail bolted down and it's pretty much parallel to the edge (within 0.005mm). I also have one block on the master side bolted and it's also cock on parallel to the axis plate (within 0.002mm). Is it a good idea to loosely mount the second linear block on the master side, slide [both blocks + axis plate] on the master rail and then bolt down the second linear block to make sure both blocks are on the same line / parallel? The whole process would go like this:

    Click image for larger version. 

Name:	hiwin.PNG 
Views:	483 
Size:	42.4 KB 
ID:	10960

    This means effectively using the master rail as a reference line, according to which two linear blocks are set in the same line.

    Regards,
    dsc.

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Similar Threads

  1. Tsk profile rail preloads?
    By totts in forum Rails, Guideways & Bearings
    Replies: 2
    Last Post: 19-04-2014, 07:44 PM
  2. FOR SALE: New Hiwin HGH15 bearing blocks / carriages profile rail
    By Jonathan in forum Items For Sale
    Replies: 0
    Last Post: 06-11-2011, 05:26 PM
  3. hiwin profiled rail
    By jonm in forum Rails, Guideways & Bearings
    Replies: 7
    Last Post: 07-08-2010, 06:48 PM
  4. Hiwin Profiled Rail Question
    By Normsthename in forum Marketplace Discussion
    Replies: 8
    Last Post: 02-08-2010, 07:02 PM
  5. WANTED: WANTED: HIWIN LG25 rail
    By Smiler in forum Items Wanted
    Replies: 1
    Last Post: 01-03-2009, 08:13 PM

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •