Hello Folks
My steel arrives tomorrow. . the machine I shall be building will be based on a commercial machine. with a flat top and rails under the sides to keep them hidden and less chance of damage. most of the stone I shall be cutting on the machine have decided will be 2.4 metres long and 1.2 metre wide between 100 and 250mm thick weights various at 300kg to 500kg on the cut, so base will certainly have to be strong enough to hold that with as little deflection as
and of course I shall be keeping a Log.
My question is when do you all start posting logs is it from day 1 and add to it as you go with questions to/ from the members.
or do you build then post the log after building?.