Thread: Checks before first run of VFD
Threaded View
-
11-02-2016 #1
I'm just at the the first turn on of the 1.5kW VFD and am unsure of what I need to set up before I click run for the first time.. The "instructions" that cam with the 6040 just say to turn on and ramp up up the knob (mine doesn't have a knob)..
There are some videos on youtube walking you through what to setup but with very little information about what they're actually doing. So I'm a little hesistant to walk into something blind.. Also I don't see my specific unit.. 1.5kW 220V spindle A131NBC-2015 (edit: name)
Obviosuly there's certain settings like ramp up time etc. that I can tweak at a later date but for first turn on to test everything, is there something in particular I should be setting up before I click run? Wouldn't want to break something..
At the moment it is flashing 400.00
Thanks for any guidance!Last edited by d4cnc; 11-02-2016 at 06:38 PM.
Thread Information
Users Browsing this Thread
There are currently 1 users browsing this thread. (0 members and 1 guests)
Similar Threads
-
keeping DTIs perpendicular for runouot checks
By dsc in forum Machine DiscussionReplies: 9Last Post: 13-03-2014, 02:41 PM -
NEW MEMBER: Newbie checks in...
By Squirrel52 in forum New Member IntroductionsReplies: 1Last Post: 03-02-2011, 02:27 PM
Bookmarks