Is that slow enough?
Printable View
Hi Richard
I would imagine so it's very thin (has to be sucked through 10mm pipe) and i would imagine it should level fairly rapid. The guys are obviously using the West Epoxy for a reason so search the forum as there is a thread dedicated to epoxy leveling.From recollection i can't remember anyone mentioning infusion resin and that seemed a bit strange but there could be a reason, also that link is possibly not the cheapest so if you decide to go with it have a look round for the best price.
regards
Mike
There's a glass fibre and carbon moulding place near me, who have done a few things for me. They might be able to get something cheaper.
They always want resin that goes hard really fast, so fast it gets really really hot, but they might be worth asking.
I think the last time i did an infusion job the open time was about 30min before it started to gel, i would imagine that's more than enough time to level,Comments from our machine constructors would be helpful.