Here we go again . . . MK4
I've explored the limits of the current MK3 machine and it's time for an upgrade ! I want to cut aluminium more successfully with a better surface finish.
Here is the design so far, generally happy with it but tweaking minor things here and there:
Attachment 16942
Attachment 16947
Z axis
Box-Z design clamping the spindle all round. 15mm 4off profile rails and 8 carriages. Went for the single Z ballscrew in the end as couldn't get a twin ballscrew design to fit and give reasonable travel etc.
Attachment 16943
This is how the spindle clamps, but still keeps the rails aligned:
Attachment 16944
Y axis
Twin ballscrew driven with box surrounding Z axis. All joints overlapped such that pre-load can be set on rails before tightening. Has 20mm profile rails on 5mm epoxy.
Attachment 16945
X axis
Twin beam gantry design using 60x100x5mm RHS steel sections. This sits on 16mm open bearings which are on 16mm simply supported rails. Cannot get finance approval for 1000mm profile rails so am re-using existing parts. I'm going to use 6 open bearings per side to get the most stiffness out of it. When the time comes there is only minimal work to adapt to profile rail.
Attachment 16946
The gantry is driven by twin ballscrews, and I tried lots of layouts to get them syncronised before getting to this one. Still not 100% decided - this one has 5M HTD pulleys 31.8mm dia with 15mm wide belts. To get the link across means bolting 2 pulleys back to back. Also thinking about a single 25mm wide pulley with 9mm belts shared between the stepper and the link across (2 belts per pulley), but need to read up about 9mm vs 15mm belt strength etc.
The energy chains are split down each side. LH side is for spindle power cable, RH side is for stepper power, home/limits, auxillaries, and water cooling pipes. Now that the control box is 24V logic for limits, (homes still WIP), and all cables are shielded I'm hoping that running them together in the RH side will be OK.
Not decided on water cooling arrangement, got several options which I'll post when I finally decide. The current radiator & fan is quite bulky and 'sticks out' where ever I put it.
-
7 Attachment(s)
Re: Here we go again . . . MK4
I've started making some of the parts for the MK4 machine. Thought I'd start with an easy and relatively quick one.
Here is the Z ballscrew lower bearing bracket. The standard bearing bracket is too large to fit in so I've made my own again. I'll re-use the ballscrew and bearing from the MK3 machine which is already turned down to 6mm shaft at the end allow a pretty small bearing to be used. Just needs a new housing to suit the new design:
Laying it out and machining the bearing pocket:
Attachment 16954
Machining the profile leaving tabs to hold it:
Attachment 16955
Cleaned it up and set up to cnc machine the M8 pilot holes (note that this is a drill press vice - a proper precision vice is on my wishlist !)
Attachment 16956
Started the taps off in the drill press (just to get them straight):
Attachment 16957
Then finished them off in the vice with the hand tap wrench:
Since I discovered these lovely spiral fluted taps there is no going back . . .
Attachment 16958
Chamfered the thread entry with my favourite snail countersinks, then cleaned out the threads with a bolt:
Attachment 16959
Done:
Attachment 16960
More to follow . . .
-
15 Attachment(s)
Re: Here we go again . . . MK4
Next part is the Z axis stepper motor bracket.
Laying it out:
Attachment 16961
Machining the pocket - no adaptive toolpaths I'm afraid so about 1 hour to machine this:
Attachment 16962
Then the slot for the motor shaft:
Attachment 16963
Small pocket to clear the boss on the front of the stepper:
Attachment 16965
Light skim to get a level surface:
Attachment 16964
Outer profile cut:
Attachment 16966
I had problems here as I had the tool stick when it was about 10mm into the part. It was on one of the curves (which I think increases the chip load a bit) and I had about 2 seconds to go from hearing the problem developing to the spindle stopping rotating. I cleared the tool and thought I'd got away with it but it had obviously missed some steps as there was a ridge in the part. I let it finish, going easier on the feedrate, then homed the machine and ran some new full depth toolpaths working up to about a 0.5mm offset inward. This made the outer surface 0.5mm smaller all round, but at least it was smooth again. For this part it did not matter so I was lucky.
Machining the bolt slots was pretty quick:
Attachment 16967
Set it on end and machined the clearance holes for mounting (thought this might vibrate but it was fine):
Attachment 16968
Skimmed the other side down to get the final 20mm thickness:
Attachment 16970
Attachment 16971
That will do !
Attachment 16972
OK, so it was not 20.00 everywhere . . . !
Attachment 16973
Counterbored to 9mm deep (DRO coming in handy here to get them to the same depth)
Attachment 16974
Snail countersink to finish off (love these things, so much better than the star type which are a waste of time):
Attachment 16975
Done. Worked out OK in the end:
Attachment 16976
-
10 Attachment(s)
Re: Here we go again . . . MK4
Next part is the Z ballnut bracket. All started well . . .
Laying it out
Attachment 16980
Pilot holes for the threaded holes:
Attachment 16981
Skim the surface to level it:
Attachment 16982
Machine pocket to house ballnut:
(Toolpaths are fairly basic from Cut2D - gentle ramp into material, then a series of simple circles. No spiral option. But it gets the job done.)
https://youtu.be/LQdc-aWgtjA
Attachment 16983
Profile machined most of the way through leaving a bit holding it in place:
Attachment 16984
Attachment 16985
All holes drilled to size, tapped, then on the very last hole backing the tap out - it snapped ! Aargh!
Attachment 16986
Tap was 12mm into the part and bashing and picking was not working. Flatten the end off the centre punch so that was no good.
Got some Alum powder (about £3.50 off ebay for 2x100g) and mixed up a solution with hot water:
Attachment 16987
Then dropped in the part, and you can see it bubble straight away (bottom right hole).
Attachment 16988
After a day there were lots of black specs and a general browny dust settled onto the part (hole now top left).
Attachment 16989
But even after a couple of days it had only eaten about 0.5mm groove in the top of the tap. At this rate it was going to take weeks.
I tried a masonary bit (3mm tungsten carbide tipped) on a very low speed in the pillar drill and this gnawed away at it for about 15 minutes. The drill kept trying to wander off into the aluminium at the sides, so I flipped the part over and put the drill bit into the hole hoping this would guide it. It made a sound like it wasn't enjoying it much but I pressed on. After another 15 minutes of drilling I got to within about 4mm of the surface, and then the drill broke and got stuck in the hole. Luckily I managed to get it out. I've since put the part back in the Alum solution. I think another go with a 3mm masonary bit will have drilled the last bit out, but I think the thread might be beyond use. I could probably live without that bolt and use the other 5 but it is annoying me now. I'll clean it out and see what to do. Could enlarge the hole then make a plug with a flange on it and press it in from the reverse side, then drill and tap into that. Probably tap it before pressing it in just in case !
-
Re: Here we go again . . . MK4
I read something about this in an earlier post and I thought it said you had to keep it on a low light to keep it warm for it to work
-
Re: Here we go again . . . MK4
Quote:
.... it on a low heat to keep it warm for it to work
Fixed.
Have you tried putting more alum powder in to see if your concentration is too low?
-
Re: Here we go again . . . MK4
Hi Clive, Komatias,
I'd also read about constant heat but I don't have a hot plate and using the oven/hob was not allowed so I periodically drained some off and topped it up with water from the kettle. It was wrapped in insulating cloths to keep it warm for as long as possible.
I added about 100g of powder initially, and changed the whole lot for a new batch of 150g after a day or so. There was always some undissolved powder in the bottom even with lots of stirring which meant it was saturated at maximum concentration.
It was working, just slowly. I think a hot plate or keeping it fairly hot would give it more chance, I'll see what I can get hold of.
I don't know if drilling with the masonary bit would have taken 15 minutes without the Alum powder treatment or if several days in the Alum had softened it. I'm nearly through with the drill so when I'm next in the workshop I should break right through.
-
Re: Here we go again . . . MK4
Masonary bits are too blunt. You would also need to spin backwards to aid removal of the tap. I have used special carbide spade drills to remove taps. The only place in the Uk that has them is
http://www.drill-service.co.uk/Produ...60000&Tool=377
Seriously considering stocking some in 2016
-
Re: Here we go again . . . MK4
Good to know thank you. I'd ordered a solid carbide 3mm drill a few day ago, but these look better still.
-
Re: Here we go again . . . MK4
Please Don't get me wrong on what I'm about to say has I'm not pulling down what you have designed, it looks and sure will work great. But This design seems an awful lot of work and complexity and extra cost for no major benifit over a fixed gantry design.!
By this I mean the wide Gantry and wasted space at each end mean it will have about the same foot print and give about the same cutting area of Fixed Gantry.
If used Fixed gantry design with lifting Y axis allowing none lifting Z axis meaning minimal Z axis extension, essentialy just tool length would have been much stronger and far simpler design IMO.
Like I say just an observation which for the sake of others thought I'd mention and not pulling down what you are building or doing. It's looking great sure will work great and i'm looking forward to seeing it come along.
-
Re: Here we go again . . . MK4
Hi Dean,
Thank you for the comments. I understand where you are coming from and I agonised and developed this design over the last 6 months or so, including looking at fixed gantry ( I think you are referring to that blue framed fixed gantry on youtube ?). I looked at different parameters trading this and that and trying to work through all the options. I think this is version 14 !
In the end I'm pretty happy overall with this concept and think it will be pretty stiff. I also thought long and hard about the arrangement of bits to make sure slip planes were in the right direction so that bearings were not trapped and pre-loaded, and that it could actually be built in a particular order without leaving impossible joints to make.
I also wanted it to look as neat as possible so a bit of the design is for aesthetic reasons as much as anything (e.g. curved cover plates on Y axis, metal junction boxes where the energy chains end)
I'll keep you all posted, but this is probably a long build so you'll all have to wait to see if it is any good at the end. I intend to do a few simple cuts on the current machine at different feed, speed, DOC,etc and film them before it is decommissioned. Then do the same simple cuts when this one is complete to compare the finish, sound (when does resonance, chatter start kick in) plus measure the static stiffness.
-
6 Attachment(s)
Re: Here we go again . . . MK4
These arrived recently as an early Christmas present. Another ballscrew for the Y axis, and another pair of 15mm rails and carriages for the Z axis. All the other mechanical and electrical bits will come from the MK3 machine.
I ordered from Fred at BST automation. I should mention how the ordering works for custom orders. Obviously they cannot list every part in every size to I asked for a quote on the lengths I needed. This was a bit less than the website price, which was nice. I was then asked to add various items to the basket which were 'similar' to the parts I wanted. During the checking out I had to add a note to say the actual lengths I wanted, and then wait at the payment stage for Fred to amend the price. I could then confirm the order.
It's a but of a concern that the order shows stock listed parts and lengths, and you have to take it on faith (and Fred's confirmation emails) that the parts you will receive are the ones you asked for.
But I didn't need to worry - everything was exactly the length I'd asked for. They arrived in a cardboard box, not wooden, but it was well packed out.
Attachment 16998
Attachment 17000
I immediately checked the ballscrew and it ran dead true to the eye (unlike the previous ones from other sellers which arrived bent). Bearings were a nice fit on the machined ends, and the end machining was nicely done.
Attachment 16999
Attachment 17003
Attachment 17001
Attachment 17002
Last job was not forgetting to confirm goods received on AliExpress, which then releases the payment to Fred. Note how this is different to ebay. Overall very pleased with my first order from Fred. Would recommend.
-
Re: Here we go again . . . MK4
Are the ballscrew end bearings any good? The cheap ones I've seen, admittedly >2 years ago, all seemed to be quite poorly made as they exhibited end float, unless you fiddle about adding shims or better bearings. Have they improved?
For you ballnut mounts, I hope your spindle is accurately trammed, else the the surface the ballnut flange mounts on may not be perpendicular to the base within sufficient tolerance.
Looking at your design, I'm fairly sure that the weakest point will be the Y-axis. You've compensated for the small bearing spacing causing racking by using two ballscrews, which is good, however the carriage can still twist about the X-axis when a force is applied parallel to Y, due to the vectical compliance of the 20mm rail bearings. Assuming you got medium pre-load bearings (I hope not zero), their vertical stiffness will be about 274N/um. The cutter is central, so if we assume the force is distributed equally upon the Y bearigs, but in opposite directions, you'll get twice that stiffness as the bearings act in pairs (I think), so 548N/um. Bearing spacing looks like 78mm and about 200mm to the tool tip from the bearings in the Z direction. This means that the deflection at the bearings is amplified at the tool tip by a factor of 200/78 = 2.56. The stiffness of the bearings is therefore effectively reduced by the same factor, so 548/2.56=206N/um. Hmm, too be fair that's a fair bit higher that the ballscrew stiffness (I estimate ~50N/um for the two in parallel) so maybe it wont be dominant.
EDIT: Just noticed that's you've put the ballscrews on the ends of the X and Y carriages, not at the center (of stiffness), so the stiffness will be a bit worse.
-
Re: Here we go again . . . MK4
Hi Jonathan,
Bearings:
I've not opened the bearing packets yet, but I'm expecting to have to make up a shim like I did last time. I've been able to make them work on the current machine so am not too concerned.
Ballnut mounts:
The spindle is as true as I can get it - note I'm at the mercy of the flatness of the supported rail on X, and on the flatness of the extrusion for the Y rail. Based on things I've made from the MK3 machine I think it will be OK. If not there are ways and means . . .
Stiffness:
Double Y ballscrew design went in at the outset because of the reasons you mention - it cannot rack so you can push the bearings closer together. But you are right, and it bothered me for ages, that for loads in the Y direction, where it rotates around X, there is a moment between the cutting tool (reaction) and the ballscrew (input) which is resolved in the bearings. As they are close together this moment is higher, meaning more deflection.
Ways around this are to lower the ballscrew and reduce the moment - I tried between the box sections but this makes the gantry even wider fore/aft. I tried underneath, which is very good for forces, but it would get swarf on it and if it hit a clamp it would be nasty. So it went on top. The mori-seki is like that so that sealed it.
p.s. What did you mean here?
". . .Just noticed that's you've put the ballscrews on the ends of the X and Y carriages, not at the center (of stiffness), so the stiffness will be a bit worse. . . "
-
Re: Here we go again . . . MK4
Bearings: Ok, thanks for the info - I'll continue to give those a miss.
Mounts: Sounds reasonable.
Stiffness: Understood - I wouldn't say Mori-Seki doing something one way is any reason to copy, as the relevance of their reasoning is unknown. Also I'm not sure my calculation in the previous post is any good, as the bearings are close they probably can't reasonably be considered as points, plus I ignored the position of the ballnut.
P.S: See here, from page 53.
-
Re: Here we go again . . . MK4
Well that link is quite read. OK, I think I get what you are saying there. I did initially put all ballnuts in the middle of the axis, at the centre of stiffness. I hadn't though about it in the way the article suggests, it was just an intuitive start point, but the flange on the ballnut means they need alot more space which pushes everything apart.
So the X axis ballnuts are now on the 'front' of the gantry, whereas the article suggest they should be further back in the middle of the gantry. Problem is that they would hit the X bearings and make everything wider which knocks onto the frame and bed. I've only got so much space and I had wondered about an enclosure in the future so don't want to go past the edge of the table with any parts.
The Y axis ballnuts are also on the side plate of the Y axis, not in the middle of the bearings. Again the flange would push them higher in Z, and they needed much more material under the bearing mounts at each end of the ballnut to support them. It all looked too tall when I drew it.
To summarise I think what the article is saying is that because things will twist and rotate, you should put the ballnut in the centre of rotation (that is rotation of the structural parts caused by moments) so that the nut sees minimum binding loads etc. I think that is a good principle to aim for where ever possible, however I think in practice the machine I've drawn will see relatively small loads at the ballscrew due to this deflection causing a radial / binding load on the ballnut and I'm not too concerned.
-
Re: Here we go again . . . MK4
Quote:
Originally Posted by
Jonathan
Are the ballscrew end bearings any good? The cheap ones I've seen, admittedly >2 years ago, all seemed to be quite poorly made as they exhibited end float, unless you fiddle about adding shims or better bearings. Have they improved?
Jonathan the ones I've been getting from Fred are excellent far far superior to those things from Chai in every way. Finish quality and operation, they don't need a thing doing to them. They come sealed in Bags and lubed up inside a box and are light years better.!
-
Re: Here we go again . . . MK4
Quote:
Originally Posted by
routercnc
Well that link is quite read.
Mm, it's good stuff.
Quote:
Originally Posted by
routercnc
I've only got so much space and I had wondered about an enclosure in the future so don't want to go past the edge of the table with any parts.
I wouldn't prioritize the enclosure over the stiffness of the machine. The 'sufficiently strong' machine in my sig. is currently enclosed with shower curtains and sitting in a paddling pool containing 240L of coolant, in my friend's living room of all places. It's as crazy as it sounds, but it does work!
Quote:
Originally Posted by
routercnc
To summarise I think what the article is saying is that because things will twist and rotate, you should put the ballnut in the centre of rotation (that is rotation of the structural parts caused by moments) so that the nut sees minimum binding loads etc.
I agree that the radial displacement effects on the ballnut will be minimal, but I was still thinking about stiffness - namely that the center of stiffness is (by definition) the point where when the ballscrew applies a force (which can easily exceed the cutting forces), no angular deflection will occur. Prizes for working out how big the effect would be...
Dean: thanks, noted. If I ever design a machine where their form is not a constraint, I'll consider using them.
-
9 Attachment(s)
Re: Here we go again . . . MK4
As I feared the return to work after Christmas means workshop time has significantly reduced. For various reasons I've only been able to get about an hour in there.
But I have been able to get a few sessions on the CAD and this has meant I was able to go over some of the other designs and have one last go at unlocking some of the compromises. The net result is I've developed some of the other ideas and ended up with what I think is a much better design.
Old one for comparison:
Attachment 17242
Here is the new version:
iso
Attachment 17235
iso rear
Attachment 17236
X axis
Attachment 17237
Y axis
Attachment 17238
Z axis
Attachment 17239
Just X axis showing gantry, ballscrews, epoxy (orange), and custom ballscrew floating end as the ballscrews were not long enough to mount the standard floating end.
Attachment 17240
X axis drive and belt tensioning arrangement
Attachment 17243
Side View:
Attachment 17244
The new features are:
Gantry beams smaller
They are now 80x40x5 RHS steel (down from 100x60x5). I'd put too much emphasis on huge sections, whereas with a double beam gantry I could afford to scale them down and still have plenty of stiffness in reserve over a single gantry.
Because they are smaller I was able to re-configure the X-bearings, bring them closer together, and give more travel in X. They are now only 274mm apart which is getting close to my current machine spacing. I was also able to get the X ballnuts at the centre of stiffness, rather than at the ends of the gantry.
Y rails are much lower
With the smaller gantry sections the Y rails are now lower and closer to the tool, as are the Y axis bearings, which all provides more stiffness
Ballscrews lower
As the gantry sections are narrower I was much happier putting the ballscrews on the front and rear faces as there was much less of a bracket required to join them back to the main Y axis, therefore stiffer.
These are now much lower in Z which also puts them much closer to the tool, which reduces the moments, which lowers the forces on the Y bearings and makes the machine stiffer.
I was also able to put the ballnut in the centre of stiffness, rather than on the outer edge of the Y axis. There might be a marginal gain here I really don't know, but it does look nicer.
Y axis bearings spacing
By re-designing the gantry end plates to free up some space I was able to make full use of the linear rail and spread the Y axis bearings out considerably more than before - without losing travel. This should significantly improve the stiffness due to moment inputs when cutting in the Y direction. When coupled with the lower ballscrews there should be a double win here.
In one of my earlier posts I suggested that double ballscrew on Y eliminates racking - whilst this is true for rotations about Z axis, it is not for rotations about the X axis. To eliminate these you could add another 2 ballscrews lower down, but that is not practical (!) so you do still need to space the Y bearings out even with double Y ballscrews. Rotations about the Y axis are dealt with by having the double gantry beams no worries there.
X drive
I've gone with something a bit different here which does not use tensioning idlers. The steppers are on plates which are slotted, and the steppers are also in slots. Between them I should be able to tension the short belt up to the ballscrew, and the syncronising belt across to the other stepper at the same time by pushing the motor off into one corner. Everything is 5 HTD with 15mm belts.
Cooling
I've decided that there are a couple of options to place the radiator, plus the option just to go for the 'big metal bucket' out of sight. So I'm going to build it and then just see which one takes my fancy. Sometimes you can CAD things too much and get tied up in the last details.
Luckily the new design retains the parts I'd already made so nothing lost. Thank you for the comments made so far, stirring up the doubts I had about some aspects, and making me revisit the previous designs. I think it is all the better for it.
Right, time to start CAMing up some of the parts ready for whenever the next workshop session is . . .
-
12 Attachment(s)
Re: Here we go again . . . MK4
This lot arrived recently.
2off - RHS for the raised X axis sides - seems pretty square and reasonably straight
Attachment 17337
Attachment 17338
Attachment 17339
2off - 80x40x4 RHS for the gantry beams
1off 30x5 flat bar to reinforce the gantry beams where the rails will sit
Attachment 17340
2off ballnut mounting blocks (~£9 each)
Attachment 17341
And 4off 16mm open bearings to double up on the Y axis to make 4 per side (no photo)
Also, got a bit of time this week end to nearly finish the X axis motor mount / belt tensioning plate:
Laying it out:
Attachment 17350
First pocket:
Attachment 17344
More cutouts and slots:
Attachment 17345
Holes spotted, top skimmed, and profile roughed and finished:
Attachment 17346
Bought a new 6mm 2 flute 45deg helix (for aluminium) carbide from 'cncpoorboy' on ebay (for about £9) recently and just tried it out.
http://www.ebay.co.uk/itm/2014350347...%3AMEBIDX%3AIT
Very impressed with the finish:
Attachment 17347
Some work on the drill press:
Attachment 17348
Attachment 17349
Need to skim one side and tap the M5 holes for the stepper, then its another one done.
In case you were wondering the slot will hold the head of 2off M8 bolts to stop them rotating whilst allowing it to slide in the slot. On the other side will be a spacer and a bearing guide to tension the belt.
-
4 Attachment(s)
Re: Here we go again . . . MK4
Tiny bit of progress. X axis motor mount / belt tensioner plate finished.
Attachment 17523
Here is a trial fit of an M8 bolt head in the slot (final part will use an M8 nut):
Attachment 17524
Also started making one of the bits on the gantry. I snapped a cutter on final the 20mm pass ! Always the worst bit right at the bottom of a deep slot when the chips can't get out. It welded up and I didn't stop it in time.
Attachment 17525
Luckily I had a spare so finished the cut. Setting up for the holes in the edges.
Attachment 17526
-
Re: Here we go again . . . MK4
Coming along nicely where did you get that vise?
-
Re: Here we go again . . . MK4
Hi Clive
Thanks for the encouragement! If I multiplied time taken per piece by number of pieces to make I might get disheartened. So I'm trying not to think about it.
Vice was from Arceuro. It was about £35 and is surprisingly accurate (a DTI along the fixed jaw barely moves) and the base is fairly parallel to the jaw runner surface (therefore workpiece is fairly parallel to bed)
But after first use the thread got swarf on it which went into the nut and it is very hard to turn. I can't get it apart to clean it out so if you get one put a cover on the thread first. It's actually a drill press vice but is working ok for my gentle machining
To be honest I am going to replace it with a precision vice as one of the future jobs needs to be more accurate than this and I'm fed up trying to tighten the screw. Arceuro make some nice ones with ground surfaces all over and antilift jaws. They are also quite low in height which is good. if I buy one and like it I may get another as a pair of vices can be really useful
-
10 Attachment(s)
Re: Here we go again . . . MK4
It's been a while since I last posted and I'll explain why in a moment. I've made a matching pair to the last part, with a bit of finishing off to do:
Attachment 17915
Reason for the delay is that I've noticed for some time now that even mild cuts are often generating lots of chatter. I think it has been getting slowly worse, and feeling the Z axis around the rails and bearings there is some relative vibration between rail and bearing, especially at the top left bearing, when the chatter occurs.
Problem is that the chatter can quickly lead to welding, and with so many parts to make for the new machine it was time to check things out. For info I have been running these 15mm linear profile rails (classed as 15mm minature) for about 5 years on 3 successive machines, and that they were bought as used from 'fa-systems'.
I stripped the Z axis down and found significant fretting on the rail, especially around the top left bearing:
Attachment 17916
Luckily I had a second set of 15mm rails (new) that I'd ordered for the Z axis on the new mk4 machine. However, the hole spacing was 5mm further apart on the bearing carriages. I ended up drilling another set of 4 holes rather than 2 extra holes because the holes would have been too close to the existing ones:
Attachment 17917
I took the opportunity to drill some access holes in the outer plate so I could assemble the Z axis as a unit, and then bolt it on to the Y axis. It's easier to get everything lined up off the machine rather than trying to assemble it bit by bit on the machine:
Attachment 17918
I then set the first rail off a side datum, and then clocked in the other rail:
Attachment 17919Attachment 17920Attachment 17921Attachment 17922
Then assembled the Z axis onto the machine:
Attachment 17923
I trial cut revealed a much improved machine. A 1mm DOC at 900mm/min 12,000rpm 6mm 2f carbide was fine with no chatter.
Attachment 17924
So is there a moral to this story? Well my rails were used when I bought them so it's had to be sure but for the occasional poster on here who asks about rail size then I will always recommend 20mm over 15mm.
Back to the new machine. As originally drawn it had 4off 15mm rails around a box Z. Although these are used as 2 pairs loaded against each other I did not feel confident in continuing with 15mm rails all round. Luckily I had left space in the Y axis to upgrade rails or spindle size. So it was a simple matter to add pockets and fit in 20mm rails. I've ordered 20mm rails from Fred, and will use the new 15mm rails just as auxiliaries away from the spindle where the loads are lower.
-
Re: Here we go again . . . MK4
Whilst cutting another new part I used 'feedhold' to stop the machine just to check something was not going to collide. Then I hit 'start' but instead of continuing on a +X direction to the end of the cut the machine moved in +Y. It was about 8mm into a profile cut so snapped the cutter.
Luckily this was in the scrap part of the material so no harm done. I changed the bit, homed, ran it all again. Later on in the same profile cut (in the -X direction this time) it was almost to the bottom when I pressed 'feedhold' again to check one of the clamps was not going to get machined through. When I hit 'start' is again went in the +Y direction. Luckily I had my hand over the e-stop but it still took a chunk out of the part!
I've never had this happen before and haven't changed anything in software, just the Z axis bearing change. Any ideas?
-
Re: Here we go again . . . MK4
Did you by any chance stop it in a canned cycle I have a feeling that it happened to me once.:confusion:
-
Re: Here we go again . . . MK4
Quote:
Originally Posted by
Clive S
Did you by any chance stop it in a canned cycle I have a feeling that it happened to me once.:confusion:
I don't think so - I'll check the g-code when I get home as I wrote down the line number I stopped it on. I seem to remember lots of X and Y positional commands so probably not in canned cycle? It was cutting out the outline profile to a part which was almost a rectangle.
The last feedhold problem was done on a pass which had tabs on it, but it was about 50mm away from having gone up, across, and down to create the tab and was going in a straight line to the corner. I was about 20mm from the corner going X- when I pressed feedhold. Upon starting it went Y+ as if it thought it had reached the corner.
Next time I'm in the workshop I'll do some air cuts on the same file to see if I pressed the feedhold twice or something . . .
-
3 Attachment(s)
Re: Here we go again . . . MK4
OK, looking at the gcode where I had the 2 crashes (when 'starting' after a 'feedhold') and I can see there are several straight line moves (must be geometry nodes all along in a straight line from when I was creating and changing the CAD), followed by a G2 radius arc in both cases.
#1
I've read about problems with feedhold in arcs so always feedhold on a straight edge. But I was definitely on the straight bit about half way along the top edge when I pressed feedhold. About line 930. It was some way off getting to the G2 ARC at the corner. When I hit start the machine went up in +Y and snapped the tool clean off.
I've loaded the file onto my house PC (hence the DROs are all zero!) Here is the first one:
Attachment 17956
#2
This time, on the same part, I was cutting along a straight edge at the bottom, -X direction, when I hit feedhold. It had just done line 1060. This time cycle start moved the machine in +Y. I hit e-stop straight away this time and recovered it. However, there was a gouge in the work piece (!). It's cosmetic but annoying none-the-less.
Looking at the gcode shows another set of linear moves, followed by a G2 arc radius at the corner:
Attachment 17957
I'll go back to the CAD and see if there are repeat nodes in the geometry as a start, but I'm confused by this as I've used feedhold for years and not had this problem. Now twice on the same part!
I went to Mach3 website in case there was a later version - but it's still R3.0.43.066 I which is what I am running now.
EDIT:
OK, the reason for the repeat straight moves is that there are tabs on those sides. Vectric obviously adds those moves in on every pass, but only adds the Z up and over move when the required depth is met. However, I was nowhere near the depth to create the tabs (they are only 2mm high) so that might be a coincidence. So, still confused about what is going on . . .
Attachment 17958
EDIT2 / side note:
I've had to do a few 'run from here' operations after hitting the e-stop recently. It is probably out of position as it could be mid-step so I've found you need to:
1. Raise the tool right out of the workpiece
2. Re-home the machine
3. Press 'run from here' on the line you e-stopped on
4. It will show you the required resume coordinates in a window. Before accepting these you should jog or MDI to the X and Y positions it shows. If you do not it will try to move straight to that location which could be through a clamp or the workpiece etc. if you are low. This has caught me out a couple of times!
5. Press OK and it will rapid down in Z to the position it got to when the e-stop was pressed
6. Start the spindle (or there is a check box if you use spindle control from Mach)
7. Hit cycle start
-
8 Attachment(s)
Re: Here we go again . . . MK4
Some pictures of the matching 2nd upper end part - cleaned, drilled tapped and finished:
Attachment 18038
Then onto the next set of parts. Bed cleaned down and a new 10mm plate ready to cut out 4off bracket plates:
Attachment 18039
Small pockets cut and holes spotted in all 4 parts:
Attachment 18040
First one cut out:
Attachment 18041
Last one cut out:
Attachment 18042
Opening up the light cnc spots with the same 6mm spot drill:
Attachment 18045
First pair of them cleaned up, drilled out, counterbored:
Attachment 18043
The counterbore in each part was a bit nerve racking as it is to take an M8 cap head slightly under flush. This means a depth of 8.1mm in a 10mm part, which leaves just 1.9mm left. Although I had my DRO set on the drill press you still drill them blind and need to trust in the gauge not to go all the way through! I guess I could have used the depth stop nuts as a backup.
Second pair straight off the machine ready for drilling:
Attachment 18044
-
6 Attachment(s)
Re: Here we go again . . . MK4
Finished the 2nd pair off, cleaned up, holes drilled etc.
Attachment 18090
These are the corner pieces on the gantry-
Attachment 18097
Not that exciting so I thought I'd also post another way I just tried out of tapping the threads in those parts (well starting them at least) which is much quicker. I started with one of these tapping chucks from RDG tools - designed to either replace the drill press chuck or for use in the tailstock of a lathe. It has a tommy bar and the chuck is free to rotate and slide inside the morse taper housing:
Attachment 18091
Link below (they are also on e-bay)
http://www.rdgtools.co.uk/acatalog/2...ent-88025.html
Although you are supposed to tap out the existing chuck and replace it with this one I didn't want to keep swapping them over. I'd looked these over at a show so knew that the MT3 taper comes off the chuck leaving a 12mm straight rod - perfect :
Attachment 18092
Because the 12mm rod was greased I put it inside a plastic bag (to stop the grease going onto the chuck jaws) and then put in lightly in the chuck - just enough to hold it but still allow it to rotate and slide up and down:
Attachment 18093
Here it is well into tapping the M5 thread:
Attachment 18096
This takes seconds to do and you can feel the bite / back off and reduce the risk of breaking the tap.
Note that the drill press is NOT powered - I'm using the tommy bar to rotate it manually.
This worked really well, was very quick, and created threads which were perpendicular to the face. I finished them off by putting the parts in a vice and using a cordless drill.
I think the plastic will not last long, it started has started to tear already, so one option is to make a metal adapter tube which is clamped in the drill press chuck at the top, and contains a long bored out 12.05mm dia or so hole in the bottom to hold the greased rod on the end of the tapping chuck. If the bore is a good fit and there is grease in there it should stop the chuck falling out when you raise the drill press.
To have something set up permanently I might even modify a cheap drill press/stand (the ones where you put a mains drill in) to house a long rod attached to the drill chuck - a bit like the Arc Euro ones but their's only goes to about 6mm or so tap size whereas this goes to 13mm.
-
Re: Here we go again . . . MK4
I cheated a couple of days ago when I needed to tap some M8 holes in a slab of Ecocast I had just drilled. I held the M8 spiral-point tap directly in the drill chuck, and took off the drive belt on the mill (Warco VMC with multi-speed belt drive so easy to do). I could then turn the drive pulley by hand. Light down pressure on downfeed handle, and this was enough to get a good thread started, finished by hand later. For small taps, I have lightly guided them in the chuck jaws and tightened a tap wrench on to the shank (not square) of the tap to turn them. Especially with these easily-driven spiral-point taps, this works ok to get a thread started. But I'll have to have a look at the RDG tap holder the next time I see them at an exhibition - thanks.
-
Re: Here we go again . . . MK4
Hi Neale,
Yes, done something similar to that by slackening the motor / belt tension levers on the drill press. But even with the belt slack there is still quite alot of friction and it still tries to turn the motor.
To remove the belt on my Warco pillar drill completely takes a bit of time and involves a ladder, a screwdriver to open the lid, and releasing the motor bolts and is not very efficient. It's not much fun for long due to the effort of turning the chuck & motor.
The method above is quick to set up (just a quick adjustment on the chuck jaws) and is then very easy to turn.
One thing I will note is that the tap slipped occasionally, even though I tightened it as much as I could. I don't know if they do a keyed chuck version but that might be better. Maybe a bit of degrease on the inside of the chuck jaws would help. Next time I'll also try a tap handle on the round part of the tap shank as you did.
-
7 Attachment(s)
Re: Here we go again . . . MK4
Bit more progress. One of the gantry end plates was cut out over the weekend:
Attachment 18179
Tonight I drilled and tapped all the various holes. Couldn't resist a trial fit of a couple of the previous parts:
OUTER VIEW
Attachment 18180
(Note the tabs on each end still need facing off. I'll wait for the other one to be machined then do them in the same session.)
INNER VIEW
Attachment 18181
With the side plates offered up:
Attachment 18182
Attachment 18183
Attachment 18184
Another reminder of what the end sections should look like . ..
Attachment 18187
I used the tapping chuck again which made light work of the threads. Also discovered I was holding the tap wrong. I had been putting the tap right into the chuck and it gripped on the round shank - liable to slip. Looking at the 3 jaws of the chuck I noticed that it has ridges in the centre of each jaw. If you put the square part of the tap into the chuck these grip the 4 sides nicely, with 2 jaws on the flats and 1 jaw (with the ridge) on one of the chamfers of the square. Hard to describe but just put the square shank of the tap into the 3 jaw chuck and it will not rotate.
-
Re: Here we go again . . . MK4
Wow!
This looks like a masterbuild!
I love it when its over complicated ;)
Fancy, funny and fantastic!
-
Re: Here we go again . . . MK4
Very nice,
Looking forward to seeing this finished.
Mike
-
4 Attachment(s)
Re: Here we go again . . . MK4
An update on the next bits on the list - the gantry lower bearing plates. I need to make 2 mirrored parts, here is the first one progressing -
Setting up and cutting some slots. These are to adjust one of a pair of ballnut brackets. I'm going to run 2 ballnuts pre-loaded against each other:
Attachment 18410
The other holes have been spotted (to finish on the drill press) and the profile cut out. I tried something a little different to try and get the profile size as good as possible. As this sits on the X bearings I want this to be a datum part during the build. The rough profile cut was +1.0mm, then another rough cut at 0.2mm, and finally a finish cut at 0mm. You can see the finish in the photo which is excellent. I'll check with calipers how accurate the overall size came out.
Attachment 18411
I've yet to drill out the holes on the top, and there are lots of holes required in the sides, but I thought I'd try a quick fit to make sure all was well. No bolts yet just propped together but looks good!
Attachment 18412
Here is the start of the one for the other end. I had to line this one up using a DTI and get it very accurate to avoid hitting the holes in the donor plate I'm using. I've cut the slotted holes, next up will be spotting and profile:
Attachment 18413
-
4 Attachment(s)
Re: Here we go again . . . MK4
Also, I'd made a few design changes a while back but hadn't posted them so here they are.
1. Z axis
-Twin ballscrew instead of single
-Main body machined from solid
-Upgrade from 15mm miniature rails to 20mm Hiwin
Attachment 18417
Attachment 18416
2. Y axis
-Double ballnuts, one fixed ballnut housing and one floating housing to allow pre-load to be added
-Simpler bracing pieces
Attachment 18418
3. X axis
-Double ballnuts, one fixed ballnut housing and one floating housing to allow pre-load to be added
Attachment 18419
-
Re: Here we go again . . . MK4
Twin ballscrews on the Z :hororr: - should be able to punch the cutter through the work with the motor turned off !
:)
-
Re: Here we go again . . . MK4
Cheers Dave !
It might do that yes, but it is still one stepper motor so it's not any more powerful than before. Reason for doing it is that it should help reduce vibration as both sides of the Z axis are held when machining, not just one side.
-
Re: Here we go again . . . MK4
Following with interest ;)