Thread: Build Log - Herbert
Hybrid View
-
03-08-2016 #1
Yes I have 2 off 12v fans with metal mesh filters to blow air into the cabinet from the top with 2 side slots for evacuation of the warm air. All cables for VFD and from the motor drivers are shielded and grounded (once).
I have re-drawn the circuit based on a plan from a thread on here from the user Jazz.
The E-stop is based on this design and does not rely on the bob/software to stop things.
Just not sure about this latching business or what a pilz unit is.
Maybe someone can shed some light on this or on the updated wiring plan that will be uploaded soon.
Cheers,
Ian
-
03-08-2016 #2
-
03-08-2016 #3
OK, I think that relay will latch when you hit the reset, then stay on until you hit the e-stop. This will tell the BOB to stop.
BUT ! - it looks like you are switching the mains live feed through the same 12V relay ? Don't do this. You need a contactor in-between. This is like a relay but can handle mains voltage and has purposed built contacts. It is controlled by a low voltage signal - i.e. one coming out of the safety relay.
Either revert back to your first design, or get familiar and be happy with contactors and mains control.
Thread Information
Users Browsing this Thread
There are currently 1 users browsing this thread. (0 members and 1 guests)
Similar Threads
-
BUILD LOG: a Steel Box Section Build with SBR20 & Ballscrews Plus a few questions
By grain_r in forum DIY Router Build LogsReplies: 130Last Post: 27-01-2023, 06:47 PM -
BUILD LOG: New Build - For Your Amusement - MK-2 build
By Karl in forum DIY Router Build LogsReplies: 12Last Post: 08-02-2017, 08:03 PM
Bookmarks