Top and bottom plates drawn, just the spacer block left. The smaller hole in the bottom will take a 20mm spigot that will lock into an R8 collet in the spindle. Metal arrived today and the mill is almost ready to go.
https://ddmetalproducts.co.uk
There are currently 1 users browsing this thread. (0 members and 1 guests)
Forum Rules
Bookmarks