Click image for larger version. 

Name:	IMG_20170310_163009[1].jpg 
Views:	1139 
Size:	219.0 KB 
ID:	21026Click image for larger version. 

Name:	IMG_20170310_163042[1].jpg 
Views:	1096 
Size:	208.7 KB 
ID:	21027Click image for larger version. 

Name:	IMG_20170310_163157[1].jpg 
Views:	1130 
Size:	164.6 KB 
ID:	21028



So more or less finished massive thanks to Dean for all his help and the Forum for all the information – pictures of anything being great – when your studying the detail.

Some changes to the original design being the 50 x 50 x 200mm ball screw housings because of the
problem of getting at screws on the original RM2020 Housings.

Just drilled and fixed the mdf bed down and surfaced it – its a learning curve, you have to move at
fast speeds and feeds to prevent burning (1500mm/min and 24000 rpm)

Guard for the end belt and cover for the Z axis to fitted, plus a dust shoe to be made or purchased.
Extraction system to be fitted and probably a vacuum plate.

Now to get to grips with Mach3 and do some CAD drawings.
I have a queue of neighbours and friends wanting house signs – I'd rather eat worms than do them, but SHMBO will make me.