Thread: Router Build number 2
Threaded View
-
28-02-2018 #28
so I went back to the start and stated fresh as I had made a few mistakes on the size
im still thinking of in cooperating a 4th axis to also machine aluminum.
im assuming running it down the length of the x to one side is the best option as it will be stiffer with the spindle not traveling across the gantry.
What I cant decide is is it better to have it inside the main frame or mounted outside given the main machine is going to be fairly heavy duty and was going to have raised rails. What I don't want is it to take loads of time to set the 4th up so I never end up using it but at the same time it would be good to keep the machine as compact as possible.
any one got any advise?
Thread Information
Users Browsing this Thread
There are currently 1 users browsing this thread. (0 members and 1 guests)
Similar Threads
-
BUILD LOG: DIY Plasma build - Attempt number 1
By Gigalith in forum DIY Plasma Build LogsReplies: 17Last Post: 13-12-2016, 06:42 PM -
WANTED: part number
By tinshak in forum Items WantedReplies: 4Last Post: 10-02-2015, 10:10 PM -
Help With a number of build issues & uncertaintities
By bigstu67 in forum Gantry/Router Machines & BuildingReplies: 7Last Post: 24-09-2014, 03:54 PM -
BUILD LOG: A3 Router Build
By GTJim in forum DIY Router Build LogsReplies: 6Last Post: 17-02-2012, 12:53 PM -
Number plate dies and a Sieg KX3 CNC Hobby Mill
By p4tvw in forum Milling Machines, Builds & ConversionsReplies: 5Last Post: 14-04-2010, 04:51 PM
Bookmarks