How over built are we talking? the ability to take a full sheet of ply is worth something. If it wasn't the space restrictions I have I would be building a 8x4 machine in which case I guess I would be building the stronger gantry anyway.

I guess the only other way would be to have the gantry going down the length on the raised rails but have it only supported at ether end so a sheet can be passed under it?