Threaded View
-
30-11-2017 #10
The Nema's are wired in at moment which makes it a little more crazy, they need to be unwired and will go through the top of the box just above each driver through glands. The limit switches will travel through the wiring conduit which ends where they need to be, the 12v feed will travel through there before going to the BOB. The fan feeds I will run directly on the inside of the box.
It's confusing but it's a million times better than it was lol, can't finish the box until the last driver comes as I need access to the back of the plate to bolt it in. 21st day since I ordered it grrr, it was sent Epacket which is 10 days tops normally bloody Xmas, bahh humbug.Last edited by Desertboy; 30-11-2017 at 07:36 PM.
http://www.mycncuk.com/threads/10880...60cm-work-area My first CNC build WIP 120cm*80cm
If you didn't buy it from China the company you bought it from did ;)
Thread Information
Users Browsing this Thread
There are currently 13 users browsing this thread. (0 members and 13 guests)
Similar Threads
-
New Table Build, 12x6 work area, drawings up any advice?
By silverdrgn in forum Plasma Table MachinesReplies: 3Last Post: 23-01-2016, 07:34 PM -
BUILD LOG: My 1st Hybrid Steel/Ally (1150 x 850 work area) (comments/advice please)
By lebies in forum DIY Router Build LogsReplies: 18Last Post: 19-08-2014, 12:00 PM -
BUILD LOG: Melbourne Andy CNC build 1220x810 work area
By AndyGuid in forum DIY Router Build LogsReplies: 4Last Post: 20-04-2014, 08:25 PM -
RFQ: acetal parts turned lathe work
By dazza in forum Projects, Jobs & RequestsReplies: 10Last Post: 13-06-2013, 10:15 AM -
Wanted - Regular work for reliable machine shop in Northants/Kettering area
By Narkedat90 in forum Opportunities Available & SoughtReplies: 4Last Post: 06-04-2013, 04:09 PM
Bookmarks