. .

Threaded View

Previous Post Previous Post   Next Post Next Post
  1. #11
    Chaz's Avatar
    Lives in Ickenham, West London, United Kingdom. Last Activity: 26-08-2025 Has a total post count of 1,654. Received thanks 115 times, giving thanks to others 71 times.
    Quote Originally Posted by Desertboy View Post
    I managed to blag my old man to pay for 2 of my AM882's in exchange for driving 8-10 hours to the docks on Sunday in a week or 2 to collect a truck driver. I can afford another 2 AM882's going to order them on Monday but should I get 3 AM882's and D542T instead? Will I notice the difference putting an AM882 on the Z?

    I didn't mention to my old man at the time I will still need a power supply lol, bought a cheap ass breakout board.

    My gut is telling me just buy 4 AM882's after all if I have one fail I can get a D524T in 48 hours for £30 and swap the AM882's round to suit.

    Of course with AM882's my 2nm look underpowered but my ballscrews are only 1605 so I would need to upgrade to 2510's on the X&Y to be worth also upgrading to 3nm nema 23's or even nema 24's on the Y. Possible future projects ;)
    I dont know the tech details but buy once and buy right.

    My own experience tells me this, otherwise it costs more time / money / problems in the long run.

  2. The Following User Says Thank You to Chaz For This Useful Post:


Thread Information

Users Browsing this Thread

There are currently 4 users browsing this thread. (0 members and 4 guests)

Similar Threads

  1. New Table Build, 12x6 work area, drawings up any advice?
    By silverdrgn in forum Plasma Table Machines
    Replies: 3
    Last Post: 23-01-2016, 07:34 PM
  2. BUILD LOG: My 1st Hybrid Steel/Ally (1150 x 850 work area) (comments/advice please)
    By lebies in forum DIY Router Build Logs
    Replies: 18
    Last Post: 19-08-2014, 12:00 PM
  3. BUILD LOG: Melbourne Andy CNC build 1220x810 work area
    By AndyGuid in forum DIY Router Build Logs
    Replies: 4
    Last Post: 20-04-2014, 08:25 PM
  4. RFQ: acetal parts turned lathe work
    By dazza in forum Projects, Jobs & Requests
    Replies: 10
    Last Post: 13-06-2013, 10:15 AM
  5. Wanted - Regular work for reliable machine shop in Northants/Kettering area
    By Narkedat90 in forum Opportunities Available & Sought
    Replies: 4
    Last Post: 06-04-2013, 04:09 PM

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •