Threaded View
-
30-11-2017 #11
I don't think so. The MCB should trip after a sustained overload, i.e. at something like twice the rated current, they should both trip within a minute (roughly). The B curve/C curve thing is about how much of a short-duration overload they can take to cope with switch-on surge and so on. That's not so different from a slow-blow fuse, so the only reason for fitting a fuse as well is in case the MCB doesn't work. How much should you trust safety devices? My machine has a couple of fuses on the PSU (commercial item) and one of those blew once. The PSU was operating well within its rating; it was just that the fuse was tired and didn't want to play any more. I'm not sure that I don't trust the MCB more than the fuse, but I don't have much experience of them in this kind of situation. On the other hand, all your house wiring is probably protected by a bunch of MCBs, so the people who make the rules trust them.
Thread Information
Users Browsing this Thread
There are currently 1 users browsing this thread. (0 members and 1 guests)
Similar Threads
-
New Table Build, 12x6 work area, drawings up any advice?
By silverdrgn in forum Plasma Table MachinesReplies: 3Last Post: 23-01-2016, 07:34 PM -
BUILD LOG: My 1st Hybrid Steel/Ally (1150 x 850 work area) (comments/advice please)
By lebies in forum DIY Router Build LogsReplies: 18Last Post: 19-08-2014, 12:00 PM -
BUILD LOG: Melbourne Andy CNC build 1220x810 work area
By AndyGuid in forum DIY Router Build LogsReplies: 4Last Post: 20-04-2014, 08:25 PM -
RFQ: acetal parts turned lathe work
By dazza in forum Projects, Jobs & RequestsReplies: 10Last Post: 13-06-2013, 10:15 AM -
Wanted - Regular work for reliable machine shop in Northants/Kettering area
By Narkedat90 in forum Opportunities Available & SoughtReplies: 4Last Post: 06-04-2013, 04:09 PM
Bookmarks