Threaded View
-
15-06-2017 #11
Not mine lol I have the manual for it recommends a minimum 30amp also the cable I only discovered the wiring because the smell of plastic burning coming from behind my tiles and when I got the melted charded mess out I was glad it was under tiles and not plasterboard lol.
I want to learn Clive so tell me where I'm wrong I need to be educated lol as my teacher said you don't learn anything by being right it's only by being wrong that you learn ;)
I assume that if I only use 1 phase out of 3 then I need not worry about balancing at all? I want to wire the 3 phase socket as it's easier to convince my dad to let me fit the socket if it's 3 phase.
Also I have the 3 phase stuff and I want to buy a 3 phase plasma cutter so it all makes good sense to me if it's safe of course.Last edited by Desertboy; 15-06-2017 at 07:54 PM.
http://www.mycncuk.com/threads/10880...60cm-work-area My first CNC build WIP 120cm*80cm
If you didn't buy it from China the company you bought it from did ;)
Thread Information
Users Browsing this Thread
There are currently 11 users browsing this thread. (0 members and 11 guests)
Similar Threads
-
New Table Build, 12x6 work area, drawings up any advice?
By silverdrgn in forum Plasma Table MachinesReplies: 3Last Post: 23-01-2016, 07:34 PM -
BUILD LOG: My 1st Hybrid Steel/Ally (1150 x 850 work area) (comments/advice please)
By lebies in forum DIY Router Build LogsReplies: 18Last Post: 19-08-2014, 12:00 PM -
BUILD LOG: Melbourne Andy CNC build 1220x810 work area
By AndyGuid in forum DIY Router Build LogsReplies: 4Last Post: 20-04-2014, 08:25 PM -
RFQ: acetal parts turned lathe work
By dazza in forum Projects, Jobs & RequestsReplies: 10Last Post: 13-06-2013, 10:15 AM -
Wanted - Regular work for reliable machine shop in Northants/Kettering area
By Narkedat90 in forum Opportunities Available & SoughtReplies: 4Last Post: 06-04-2013, 04:09 PM
Bookmarks