Threaded View
-
10-04-2018 #11
Hi Jazz,
I did this drawing to hear from people here who have actually done a drag chain since i have not.

So thank you all for getting involved again and saving beginners like me from obvious mistakes.
So.
The drawing is worst case and 2 spare cables. 4mm2 wasnt drawn.
Ok recap.
I hope i can drop 2 coolant 8mm lines and replace it with 12volt line.
Q1
I would like to know about pc pump radiator setup on z assembly for spindle cooling, is it an ok option?
i can drop from 1.5 to 1.0 mm2 for spindle.
i can drop from 6mm air to 4mm
I have 2 cy 4x0.75 spares drawn.
Q2
Does one stack cables in a dragchain or should it be avoided?
Grtz Bert
Verstuurd vanaf mijn SM-A320FL met Tapatalk
Thread Information
Users Browsing this Thread
There are currently 1 users browsing this thread. (0 members and 1 guests)
Similar Threads
-
BUILD LOG: First time build - Steel Frame CNC Router
By examorph in forum DIY Router Build LogsReplies: 144Last Post: 19-10-2023, 06:25 PM -
BUILD LOG: First Build 5 x 12 Steel Frame CNC router
By Scott Damman in forum DIY Router Build LogsReplies: 104Last Post: 18-01-2017, 06:36 PM -
BUILD LOG: Steel frame cnc router design/build
By CraftyGeek in forum DIY Router Build LogsReplies: 110Last Post: 06-05-2015, 10:00 PM -
600x900 Steel welded router build
By embraced in forum Gantry/Router Machines & BuildingReplies: 7Last Post: 08-10-2014, 10:55 PM -
BUILD LOG: First steel diy CNC router build
By ivars211 in forum DIY Router Build LogsReplies: 59Last Post: 28-07-2014, 08:29 PM




Reply With Quote
Bookmarks