Threaded View
-
11-11-2017 #10
Ok 1st pouring round.
I prepped 0.5 kg of epoxy.
Mix is 135 vs 365 expoy.
And yes.. in the first round i found out epoxy leaks through everywhere.
Goodthing.. acryl kit can stop epoxy leaks .
I made good use of the leaked epoxy by coating all surfaces of the next round... with a bit of luck i will have no problems there...
The 2nd round will be some 2.0 kg.
last round 0.4 kg.
I have made a decision on the Linear parts bom list today... i will order wide carriages for the x axis.
Fred: i will be ordering soon :-)
Hope to have the parts this year.
Lots of new things to think about!
Do you guys have any clue for how long i need to keep the temperature @20+ C for curing epoxy evenly?
Maybe 4 days or so?
Grtz
Bert.
Verstuurd vanaf mijn SM-A320FL met Tapatalk
Thread Information
Users Browsing this Thread
There are currently 1 users browsing this thread. (0 members and 1 guests)
Similar Threads
-
BUILD LOG: First time build - Steel Frame CNC Router
By examorph in forum DIY Router Build LogsReplies: 144Last Post: 19-10-2023, 06:25 PM -
BUILD LOG: First Build 5 x 12 Steel Frame CNC router
By Scott Damman in forum DIY Router Build LogsReplies: 104Last Post: 18-01-2017, 06:36 PM -
BUILD LOG: Steel frame cnc router design/build
By CraftyGeek in forum DIY Router Build LogsReplies: 110Last Post: 06-05-2015, 10:00 PM -
600x900 Steel welded router build
By embraced in forum Gantry/Router Machines & BuildingReplies: 7Last Post: 08-10-2014, 10:55 PM -
BUILD LOG: First steel diy CNC router build
By ivars211 in forum DIY Router Build LogsReplies: 59Last Post: 28-07-2014, 08:29 PM
Bookmarks