. .

Hybrid View

Previous Post Previous Post   Next Post Next Post
  1. #1
    Ok First with the spindle wires (three of them) if you have them connected incorrectly it will run in reverse so when you first start it check to make sure it is spinning the correct way. If it is wrong just change over any two of the wires.
    You can do this at the VFD end on the U:V:W terminals.

    You will have to ask cnc4you if the parameters have been set up in the VFD. The Chinese ones quite often need to be set. There is a list of them on the forums some where.
    ..Clive
    The more you know, The better you know, How little you know

  2. #2
    Back when I bought my VFD and spindle from CNC4YOU, they came already configured for front-panel control of speed and needed tweaking for Mach3 speed control. But that was over 5 years ago. Good news is that the same VFD and spindle are still working and in regular use!

  3. #3
    I have been trying to look at the manual but most of it is going straight over my head and im not sure what much of it means, they did mention it should be set up but looking at the instructions and what you say maybe its not? what are the things that I should be checking? im assuming some how I can power it up to look and not blow anything up?

  4. #4
    can anyone help, what are the main settings I should be checking on the Huanyang vfd before starting the spindle up?

  5. #5
    Building a CNC machine to make a better one since 2010 . . .
    MK1 (1st photo), MK2, MK3, MK4

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •