Ok I think that the two cables that go to the vfd that control the spindle stop/start are the one's that I have put a red ring around.

Make a note of which terminals they are connected to. Then disconnect them and check them for continuity to the vfd FOR/DCM if necessary remake the connections.

I have never used that controller but I can see Dean's influence in there .

Click image for larger version. 

Name:	cmsio box.jpg 
Views:	401 
Size:	477.6 KB 
ID:	22672