Thread: 3d carvers
-
18-12-2017 #1
i was watching a youtube video and came across this and i thought i would ask how long it taken to machine and they said 10 hours which was made on a high spec machine, i then asked how much that piece was worth to see if that piece is worth the 10 hours of constant machining and he said 50$. How the bloody hell do these people survive because if i was to do 10 hours of constant cutting im pretty sure my electricity bill would be that let alone trying to sell it to make a living lol.
Here is the design
Last edited by reefy86; 18-12-2017 at 05:31 PM.
-
18-12-2017 #2
I'm not buying that takes 10 hours to machine on a high end machine and what is a high end machine lol all sounds like jargon to me.
It's a nice carving but nothing special I'll have to see how long it takes me to machine something like that but I bet it's less than 10 hours even with my slow ass 1605 ballscrews lolLast edited by Desertboy; 18-12-2017 at 08:30 PM.
http://www.mycncuk.com/threads/10880...60cm-work-area My first CNC build WIP 120cm*80cm
If you didn't buy it from China the company you bought it from did ;)
-
18-12-2017 #3
Probably most CAM software gives an estimate of the cutting time once you have the geometry and toolpaths defined, I know for certain that CamBam does. This means an estimate can be obtained without actually cutting anything.
Looking at the picture and the finish obtained, assuming that finish is right from the tool, I would say 10 hours is reasonable.Last edited by EddyCurrent; 18-12-2017 at 08:36 PM.
Spelling mistakes are not intentional, I only seem to see them some time after I've posted
-
The Following User Says Thank You to EddyCurrent For This Useful Post:
-
18-12-2017 #4
Well when i say high end i mean it looks well built and using hiwin rails/ballscrews and all made of steel. here is the video :)
https://www.youtube.com/watch?v=_PMY...13612908295049
-
18-12-2017 #5
How do they justify the costs though? its not something that concerns me because if i do something like this it will be for personal use but if it was to make a living then i'd be worried about selling these for £40-£50 when you have to consider electricity cost and even at £50 for 10 hours thats overtime for less then minimum wage.
-
18-12-2017 #6
Really this surprises me I saw 8 head machines at a factory in Lithuania eating carving like this in not a lot of time at all they would work on 8 individual (Clone) carvings at a time.
Scaring me because what I have planned is a damned site more complicated than these carvings lol.Last edited by Desertboy; 18-12-2017 at 09:11 PM.
http://www.mycncuk.com/threads/10880...60cm-work-area My first CNC build WIP 120cm*80cm
If you didn't buy it from China the company you bought it from did ;)
-
18-12-2017 #7
Desertboy gave one answer, multiple head machines. 8 hours for 8 carvings = 1 hour per carving
Spelling mistakes are not intentional, I only seem to see them some time after I've posted
-