Thread: Newbie new build
Threaded View
-
02-01-2018 #12If you go the steel route mount the rails on the top as it is much easier, the way the epoxy works is that you make a moat on the two rails with a bridge between them this way the epoxy will flow around and give you the flat plane you require.Also to reduce materials; at a cursory glance if you wanted side mount rails I wonder if you would gain strength and reduce flexing movements by putting those rails on the inside of the frame?
(Though no doubt you'd probably lose some working width).
You use the very slow curing epoxy made by Wests 205 - 109 fluid for about 8 hours.
Search of the forum for epoxy levelling..Clive
The more you know, The better you know, How little you know
-
The Following User Says Thank You to Clive S For This Useful Post:
Thread Information
Users Browsing this Thread
There are currently 1 users browsing this thread. (0 members and 1 guests)
Similar Threads
-
BUILD LOG: New Build - For Your Amusement - MK-2 build
By Karl in forum DIY Router Build LogsReplies: 12Last Post: 08-02-2017, 08:03 PM -
BUILD LOG: New Build 1000x600x200mm (newbie)
By Noplace in forum DIY Router Build LogsReplies: 139Last Post: 21-04-2016, 05:46 PM -
Newbie CNC Build
By JunkieHobbo in forum Gantry/Router Machines & BuildingReplies: 35Last Post: 13-04-2012, 07:41 PM -
BUILD LOG: Newbie First Build 3000mm x 1500mm
By psiron in forum DIY Router Build LogsReplies: 16Last Post: 16-07-2010, 11:02 AM -
BUILD LOG: Newbie First Build
By Dr Snuggles in forum DIY Router Build LogsReplies: 0Last Post: 10-01-2010, 07:05 PM



Reply With Quote
Bookmarks