Thread: TTS Tooling system
Threaded View
-
21-01-2018 #13
Did some assessment on repeatability, found two results...
Took a few random tools, zeroed the Z axis with my Haimer probe and then swapped tools, going to G1 Z0 F100...
T1 0mm
T3 +0.06mm
T8 +0.09mm
T10 +0.08mm
Now, before i dig any further, do those figures seem reasonable for a Bridgeport conversion??
No point looking for issues that are OK or can't be fixed.
Second result - with the Haimer probe fitted, if i repeatedly approach Z0 at F100 I get perfect result of zero every time. If I increase speed to F200 I get an error of +0.03mm, going to F300 or above I get an error of +0.04mm every time.
My thoughts are a following error in the servo setup maybe, overshooting and not correcting possibly?
Thread Information
Users Browsing this Thread
There are currently 1 users browsing this thread. (0 members and 1 guests)
Similar Threads
-
RFQ: Semi automatic welding system Linear beam control system
By richway in forum Projects, Jobs & RequestsReplies: 0Last Post: 24-01-2017, 08:54 PM -
FOR SALE: Various tooling
By millietess in forum Items For SaleReplies: 5Last Post: 12-01-2015, 10:00 AM -
FOR SALE: tooling for sale
By davy in forum Items For SaleReplies: 4Last Post: 10-11-2012, 11:37 PM -
Tooling
By p1lts in forum Tool & Tooling TechnologyReplies: 9Last Post: 11-10-2011, 08:14 PM -
HSK Tooling
By Dairsie in forum Tool & Tooling TechnologyReplies: 3Last Post: 02-09-2011, 10:07 PM
Bookmarks