Quote Originally Posted by CharlieRam View Post
All the steel frame is welded apart from the steel top rail tube section which is bolted on to allow me to shim the rails prior to pouring epoxy. I'm thinking of pouring in two sessions 1 day apart so it's still able to chemically bond but 1st pour of approx 3mm to try and fill any dips and also to find any leaks! Then 2nd pour a day or two later so that any depth difference doesn't affect the shrinkage.

Sent from my SM-G950F using Tapatalk
When you do the final pour if you see any bubbles you can flash a hot air gun across the top and they will disappear.

Also don't be in a hurry to remove the moat give is at least 8-9 days before you touch it.