Threaded View
-
17-07-2018 #11
The mains is of 3 wires, live. neutral and earth, the earth going to the utility pole as well.
I did run a separate earth metal rod, because it said in the vfd manual to avoid having the same ground with a welder, and I do weld quite a bit these days.
From what I understand so far, I.ll unite all shieldings from all components in the utility box, and only at that end, and run everything into an earth, be it back in the mains or the metal rod.
If I got it right, I.ll do so in the next days and come back with the results.
Thank you.
Thread Information
Users Browsing this Thread
There are currently 8 users browsing this thread. (0 members and 8 guests)
Similar Threads
-
Need a bit of help with servo settings/setup
By alboy in forum General DiscussionReplies: 1Last Post: 07-06-2018, 11:04 AM -
PWM Settings
By Gunar in forum General ElectronicsReplies: 20Last Post: 16-02-2017, 12:33 PM -
Mach 3 default settings,
By chris w in forum Artsoft Mach (3 & 4)Replies: 4Last Post: 08-01-2016, 01:54 PM -
Home Switches & Slave Axis in Mach 3
By Tenson in forum Artsoft Mach (3 & 4)Replies: 14Last Post: 03-03-2014, 11:43 PM -
Help with settings!
By Tenson in forum General DiscussionReplies: 26Last Post: 30-09-2012, 11:26 PM
Bookmarks