Hybrid View
-
08-09-2018 #1
Quick pic of the rino geared steppers for the BC head. 30:1 gearing and apparently even though they are wormscrew very low backlash, which will do me for now. I just have to figure out the cross roller bearings and frame for these. I have three of these I bought from America a couple of years ago, one can certainly be used for a rotary 4th axis
-
15-09-2018 #2
Now painted orange.
Cross bracing steelwork still needs to go in and the detachable mount head various tools to go on the Z. Also realised I have to strengthen the x axis plate for the Z at the back with 30mm alu bars. At full 450mm extension of the z axis there is too much opperchancity for flex. Getting there!
Last edited by marbles; 17-10-2018 at 01:58 PM.
-
The Following 2 Users Say Thank You to marbles For This Useful Post:
-
17-10-2018 #3
As a 3 axis its working fine and its happily just cut out this large map in 18mm birch for a client. Phew
Haven't atached the cross bracing across the y axis but as I lower the bed height it'll need a spacer bar at the end of the Y rails to keep the linear guides true.
Once i've finished a few jobs i'll set it up to cut the aluminium parts for the B/C head and then get stuck into the 5 axis software side of things. Might go for a rotary axis first and build up to the B/C head.
Last edited by marbles; 17-10-2018 at 02:08 PM.
-
The Following User Says Thank You to marbles For This Useful Post:
Thread Information
Users Browsing this Thread
There are currently 1 users browsing this thread. (0 members and 1 guests)
Similar Threads
-
BUILD LOG: New Build - For Your Amusement - MK-2 build
By Karl in forum DIY Router Build LogsReplies: 12Last Post: 08-02-2017, 08:03 PM
Bookmarks