19-11-2018 #1
John,
Thanks for the info.
I've sent you an email.
-
20-11-2018 #2
Nice build, following with interest, I am also doing an epoxy build. The laser cut moulds look very neat.
Have you decided on your epoxy % and aggregate mix? Will you be vibrating the molds?
Nick
-
21-11-2018 #3
Hi Nick
I will not be vibrating the molds, some sit on a surface plate that is used to provide a flat plane. I will be tamping the mix down in 25-50mm layers.
The Mix will be nominally 12% epoxy by volume. When I do the pour I will do a test just before to make sure the stone and sand batch has not changed.
Page down this post of a previous pour.
https://www.model-engineer.co.uk/for...p?th=51617&p=3
The objective is to use the least amount of epoxy.
I plan to pour over the weekend if all goes well.
Regards
JLast edited by John McNamara; 21-11-2018 at 08:17 AM.
-
03-12-2018 #4
Hi All
At last the first casting has been poured
Link below.
I will be very interested to see how accurate the cast in position rail supports are.
I will strip the mold later this week.
Regards
John
https://www.model-engineer.co.uk/for...?th=139042&p=2
-
09-12-2018 #5
John,
Can you give us an update on the results of the first pour?
In particular - how is the alignment / flatness of the bearing mounting plates?
I've been doing a lot of reading, and am pretty sold on epoxy granite due to the excellent damping characteristics.
If I can cast in a linear bearing mounts with acceptable accuracy at home, and avoiding the need for post-machining, I'll be out the door for 20-40kg of epoxy.
Also, can you share how much the Megapo
-
10-12-2018 #6
Hi Pippin
I will be posting the results soon, my workload has piled up so have not had much time for the machine.
I have managed to prepare and undercoat the casting, there were more blemishes than I would have liked, I filled them with body filler and the part is now undercoated. The part is very massive too heavy for me to lift. Tapping it with a hemmer yields a dull click only, even on the metal parts. the damping propertied of mineral cast epoxy is clearly evident
A prelim check with a straight edge indicates that the cast in position rail mounts are accurately located and co-planar . By eye I was unable to see a gap. However I will feel happier when I have tested them properly. Now that the part is clean I will set it up on jacks on surface plate to take some proper measurements.
Regards
John
-
12-12-2018 #7
Hi All
I have reviewed the accuracy of the casting and am very pleased. Link below.
https://www.model-engineer.co.uk/for...?th=139042&p=2
The maximum error is 0.0018" as cast, that will be reduced by lapping to high accuracy there is not a lot of metal to remove so the process will not take a lot of time.
Regards
John
-
28-01-2019 #8
Hi All
The Base casting is poured!
This is the largest and heaviest casting over 200KG. I cant wait to remove it from the mold, finish and undercoat it than assemble the columns and gantry castings so that I can take some measurements.
Regards
John
https://www.model-engineer.co.uk/for...?th=139042&p=3Last edited by John McNamara; 28-01-2019 at 01:40 PM.
-
07-02-2019 #9
Hi All
At last the base, columns and cross-member are one and I don't believe I could achieve the level of accuracy obtained without a laser cut mold.
https://www.model-engineer.co.uk/for...?th=139042&p=3
Regards
John
-
The Following 2 Users Say Thank You to John McNamara For This Useful Post:
-
12-02-2019 #10
Hi All
Assembly of some of the laser cut parts, also some machining done.
Write up here:
https://www.model-engineer.co.uk/for...?th=139042&p=3
Regards
John
Thread Information
Users Browsing this Thread
There are currently 2 users browsing this thread. (0 members and 2 guests)
Similar Threads
-
RFQ: Can someone build me a frame and gantry setup?
By GREGGYMAC in forum Projects, Jobs & RequestsReplies: 0Last Post: 09-01-2018, 11:30 AM -
FOR SALE: CNC frame or completed machine
By fifa in forum Items For SaleReplies: 0Last Post: 18-02-2017, 03:52 PM -
BUILD LOG: Desktop type router - Fixed gantry - steel frame MK2
By Tom J in forum DIY Router Build LogsReplies: 14Last Post: 02-01-2017, 09:32 PM -
BUILD LOG: Vertical fixed gantry. Design & build. (Steel/epoxy)
By Greeny in forum DIY Router Build LogsReplies: 8Last Post: 19-08-2013, 08:26 PM -
Damping Machine Frame
By Tenson in forum Gantry/Router Machines & BuildingReplies: 0Last Post: 28-01-2013, 01:44 PM
Bookmarks