Hybrid View
-
23-12-2018 #1
So I went and googled, and eventually found a data sheet with some maths in it and the recommended figures for pre-tension are suprisingly high, something like 1/3 to 1/2 of the full running tension for a 2 pulley system, more if you have multiple pulleys. This means that for a 4Nm Nema24 stepper and 27 tooth AT5 pulleys (which are quite big) you're looking in the region of 60...90N, which is more of a radial force than some steppers of that size will be happy with: and with smaller pulleys things would be worse.
-
24-12-2018 #2
With CNC precision I don't bother with tension, I simply put the wheels to the correct separation and it just works. If using a belt for linear positioning then you should know what tension you require and make sure you have enough teeth engaged to carry it.
Thread Information
Users Browsing this Thread
There are currently 1 users browsing this thread. (0 members and 1 guests)
Bookmarks