Threaded View
-
01-05-2019 #5
Thank you two for the replies! I have been implementing some of the things you were talking about in my spare time, but much more needs to be done yet.
What I changed:
- I added angles and connector plates. My plan is to mount the spoilboard on the angles.
- I added the Z-Axis. Currently, due to the different heights of the Rails and the Screw-sleds, the plate holding the spindle has a weird U-Shape. I could cut into the Z-Carriage and sink the screw into the gantry a bit to make this flat, but thus sacrifice gantry rigidity. Any thoughts on this?
- I also added Angles to help support the Z-Carriage, like Washout recommended.
What I am yet to do:
- I understand the thought about keeping the mounting plates adjustable, thus I will design out those green plates to make actual mounts. The same for the back bearings.
- I want to add motors to both the Gantry for the Y-Axis and the Z-Axis. For the Y Axis I thought about mounting them in the sidepanel holding up the gantry. For the Z-Axis I thought about lengthening the top plate and hanging the motor there. Would this be a problem in terms of placing extra torque on the Gantry?
I also have a couple more questions:
- Should I put in two more profiles to brace the bed in the Y direction? Crossbracing will be hard using only Aluminium profile
- How thick should the different Alu plate parts, like the bearing plates, sidepanels and Z-Carriage be? Currently, I have all those set at 20mm thickness.
- What about endstops? I have access to a 3D printer, can I use that to print mounts for the endstop sensors, or would those be too flimsy? I do not see them having to take much force, but maybe I am missing something here.
What would be the advantage using a single motor? I am guessing the, more or less, guaranteed synchronization of the ballscrews?
Regarding this, would it also work if I were to flip-down the part of the Z-Carriage in the back that currently is mounted to the Screw Sled? That way I could freely adjust the height. I would only probably have to do it behind the current place where the screw is mounted, since I would hardly be able to actually screw anything in the other way around. Also, regarding the washers, would I just simply place washers between the sled and what I want to mount? The question arises, since that would massively decrease the area of contact between the two.
Again, thank you for the Replies!
-Chrono
Thread Information
Users Browsing this Thread
There are currently 2 users browsing this thread. (0 members and 2 guests)
Similar Threads
-
BUILD LOG: Desktop build with zero budget. Critique my design please?
By Nealieboyee in forum DIY Router Build LogsReplies: 16Last Post: 25-07-2017, 03:50 PM -
NEW TO CNC - Starting design and so forth
By PSG in forum Gantry/Router Machines & BuildingReplies: 19Last Post: 19-03-2014, 10:30 AM -
Critique required on y-axis design.
By Spedley in forum Gantry/Router Machines & BuildingReplies: 2Last Post: 06-05-2013, 09:17 PM -
About to build CNC miller, need design critique please
By JW149 in forum Milling Machines, Builds & ConversionsReplies: 8Last Post: 23-04-2012, 09:28 PM -
NEW MEMBER: About to build CNC miller, need design critique please
By JW149 in forum New Member IntroductionsReplies: 1Last Post: 22-04-2012, 07:01 PM
Bookmarks