one more.this was an interesting job took 3 of us about 10 days,,it was almost ready for powder coat at this stage before going off to be fitted out elsewhere.
the 3 frames at the top fully rotate,and would be fitted out with vac beds and formers for car interiors.
1 before this went to bentley some years back,i would have like to have seen it in action
Click image for larger version. 

Name:	IMG_0820.jpg 
Views:	432 
Size:	745.8 KB 
ID:	26446
Click image for larger version. 

Name:	IMG_0821.jpg 
Views:	411 
Size:	748.3 KB 
ID:	26447
Click image for larger version. 

Name:	IMG_0822.jpg 
Views:	412 
Size:	746.9 KB 
ID:	26448