. .

Threaded View

Previous Post Previous Post   Next Post Next Post
  1. #11
    Once I fit the gantry end plate assemblies to the gantry I wont be able to mount the Z assembly without removing one of them, therefore I think this it is time to align and tighten the Y rails to the gantry in their final location.

    For this I have just machined some precise setting tools, they were machined as a pair to ensure they are identical.

    Click image for larger version. 

Name:	IMG_20200102_162536 (Large).jpg 
Views:	2351 
Size:	408.1 KB 
ID:	26988

    Here they are attached to the gantry, they bolt into the T-slot. Plan is to snug them up, the milled faces should then act as a reference surface to match up the reference edge on the hiwin rail, they will be moved along for each rail bolt. Note that I made them long enough so they extend across two of the high points that are on the reference plane on the face of the gantry extrusion.

    Click image for larger version. 

Name:	IMG_20200102_165110 (Large).jpg 
Views:	2318 
Size:	80.4 KB 
ID:	26989 Click image for larger version. 

Name:	IMG_20200102_165124 (Large).jpg 
Views:	2307 
Size:	258.6 KB 
ID:	26990

    First gantry end assembly bolted in place, I used countersunk M8 bolts rather than cap head to reduce the amount of material removal for the counterbore, meant the countersinks had to be done on the mill as there is very little adjustment vs a cap head. As well as the 8 M8 bolts into the end of the extrusion there are also two M6 bolts bolting up through the X bearing plate into the two T-slots on the bottom of the gantry.

    Click image for larger version. 

Name:	IMG_20200102_173710 (Large).jpg 
Views:	2377 
Size:	80.5 KB 
ID:	26983 Click image for larger version. 

Name:	IMG_20200102_173726 (Large).jpg 
Views:	2320 
Size:	93.6 KB 
ID:	26984

    Bottom view showing bolts fixing up into extrusion:
    Click image for larger version. 

Name:	IMG_20200102_174148 (Large).jpg 
Views:	2355 
Size:	95.7 KB 
ID:	26985

    Plate-plate joint using the alignment slot:
    Click image for larger version. 

Name:	IMG_20200102_174424 (Large).jpg 
Views:	2337 
Size:	87.9 KB 
ID:	26986
    Last edited by devmonkey; 02-01-2020 at 09:20 PM.

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Similar Threads

  1. BUILD LOG: 8x4 router build. Steel base & Aluminium gantry gantry
    By D-man in forum DIY Router Build Logs
    Replies: 57
    Last Post: 13-12-2019, 10:43 AM
  2. BUILD LOG: Design stage - All steel - 1200x750x110 - aluminium capable (hopefully)
    By oliv49 in forum DIY Router Build Logs
    Replies: 3
    Last Post: 08-06-2018, 01:18 PM
  3. welding steel base or just getting aluminium extrusion
    By reefy86 in forum Gantry/Router Machines & Building
    Replies: 200
    Last Post: 15-01-2018, 08:55 AM
  4. BUILD LOG: Steel Frame, Aluminium Hybrid Design Thread
    By f1sy in forum DIY Router Build Logs
    Replies: 0
    Last Post: 23-02-2016, 10:04 AM
  5. Steel vs Aluminium
    By gavztheouch in forum Metalwork Discussion
    Replies: 4
    Last Post: 26-05-2014, 10:11 PM

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •