. .

Hybrid View

Previous Post Previous Post   Next Post Next Post
  1. #1
    Right I've made a decision!

    I called around a load of my usual aluminium guys, Smiths, Aalco, Blackburns, plus a couple of local metal shops. No one has any 6x3x3/8 box on the shelf (even Aalco who have a warehouse near me about 10 acres in size) and although they could get it I would need to buy a full length. To be fair I didn't try Simmal.

    I've built two previous machines using 6x2x1/4 box and they worked fine albeit I had to shim the rails, only very slightly as I didn't have a mill back then and I had to bolt blocks into the ends to bolt into (not required on the 3/8 box). Anyway I'm just going to go with the original plan from the first post in this thread, will order some 160x80 Item heavy clone from KJN tomorrow.

    I will first try to just mount rails directly to the central flat on the profile, if this turns out too wobbly I will plate over the slots and fix rails to plate.
    Click image for larger version. 

Name:	profile.jpg 
Views:	1717 
Size:	896.9 KB 
ID:	26845

  2. #2
    I've started milling parts for the Z.

    Front plate and rail spacers finished, all fits well. These large plates take an age to mill out on my manual mill.
    Click image for larger version. 

Name:	IMG_20191213_160407 (Large).jpg 
Views:	1807 
Size:	290.5 KB 
ID:	26856


    At least drilling the holes accurately is simple with the DRO.
    Click image for larger version. 

Name:	IMG_20191211_155053 (Large).jpg 
Views:	1766 
Size:	399.2 KB 
ID:	26865

    Also took a delivery of bolts for the machine:
    Click image for larger version. 

Name:	IMG_20191213_160600 (Large).jpg 
Views:	1791 
Size:	136.5 KB 
ID:	26855
    Attached Thumbnails Attached Thumbnails Click image for larger version. 

Name:	IMG_20191213_161425 (Large).jpg 
Views:	1664 
Size:	88.3 KB 
ID:	26857   Click image for larger version. 

Name:	IMG_20191213_160412 (Large).jpg 
Views:	1622 
Size:	393.8 KB 
ID:	26858   Click image for larger version. 

Name:	IMG_20191212_150159 (Large).jpg 
Views:	1617 
Size:	152.8 KB 
ID:	26859   Click image for larger version. 

Name:	IMG_20191213_161442 (Large).jpg 
Views:	1674 
Size:	97.1 KB 
ID:	26860   Click image for larger version. 

Name:	IMG_20191213_171848 (Large).jpg 
Views:	1671 
Size:	116.1 KB 
ID:	26861   Click image for larger version. 

Name:	IMG_20191213_161928 (Large).jpg 
Views:	1624 
Size:	315.4 KB 
ID:	26862  
    Last edited by devmonkey; 13-12-2019 at 06:36 PM.

  3. #3
    Finished the Z back plate so have now assembled the Z. Everything fits perfectly. All 4 long edges of the large front and back plates were milled in a single fixture so these will all be reference edges for aligning the rails and also tramming the Z on the gantry.

    Click image for larger version. 

Name:	IMG_20191214_161417 (Large).jpg 
Views:	1830 
Size:	397.1 KB 
ID:	26870

    Pockets for the ballscrew mounts, these weren't perfect were supposed to be 1mm deep, infact 1.28mm so will need a thin shim between front plate and ball nut holder. TBH ballnut holder is not a precision item, rather it is a cast lump, so probably would have needed shimming anyway.


    Click image for larger version. 

Name:	IMG_20191214_161439 (Large).jpg 
Views:	1778 
Size:	104.6 KB 
ID:	26871

    Click image for larger version. 

Name:	IMG_20191214_160624 (Large).jpg 
Views:	1832 
Size:	321.9 KB 
ID:	26872 Click image for larger version. 

Name:	IMG_20191214_160503 (Large).jpg 
Views:	1798 
Size:	256.1 KB 
ID:	26873 Click image for larger version. 

Name:	IMG_20191214_160353 (Large).jpg 
Views:	1764 
Size:	75.2 KB 
ID:	26874 Click image for larger version. 

Name:	IMG_20191214_160341 (Large).jpg 
Views:	1813 
Size:	91.3 KB 
ID:	26875

    I'm now waiting on the extrusion to arrive for the gantry as I need this to measure off for the Y bearing plates, gantry end plates, etc. Hopefully should be here early next week.
    Last edited by devmonkey; 14-12-2019 at 05:27 PM.

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Similar Threads

  1. BUILD LOG: 8x4 router build. Steel base & Aluminium gantry gantry
    By D-man in forum DIY Router Build Logs
    Replies: 57
    Last Post: 13-12-2019, 10:43 AM
  2. BUILD LOG: Design stage - All steel - 1200x750x110 - aluminium capable (hopefully)
    By oliv49 in forum DIY Router Build Logs
    Replies: 3
    Last Post: 08-06-2018, 01:18 PM
  3. welding steel base or just getting aluminium extrusion
    By reefy86 in forum Gantry/Router Machines & Building
    Replies: 200
    Last Post: 15-01-2018, 08:55 AM
  4. BUILD LOG: Steel Frame, Aluminium Hybrid Design Thread
    By f1sy in forum DIY Router Build Logs
    Replies: 0
    Last Post: 23-02-2016, 10:04 AM
  5. Steel vs Aluminium
    By gavztheouch in forum Metalwork Discussion
    Replies: 4
    Last Post: 26-05-2014, 10:11 PM

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •