Threaded View
-
15-06-2020 #10
Last of the tedious mechanical bits I think, energy chain carriers.
Attachment 28375 Attachment 28376 Attachment 28377 Attachment 28378
Next job soldering cables, lots of it, and bolting the machine stand to the floor.Last edited by devmonkey; 15-06-2020 at 03:21 PM.
Thread Information
Users Browsing this Thread
There are currently 3 users browsing this thread. (0 members and 3 guests)
Similar Threads
-
BUILD LOG: 8x4 router build. Steel base & Aluminium gantry gantry
By D-man in forum DIY Router Build LogsReplies: 57Last Post: 13-12-2019, 10:43 AM -
BUILD LOG: Design stage - All steel - 1200x750x110 - aluminium capable (hopefully)
By oliv49 in forum DIY Router Build LogsReplies: 3Last Post: 08-06-2018, 01:18 PM -
welding steel base or just getting aluminium extrusion
By reefy86 in forum Gantry/Router Machines & BuildingReplies: 200Last Post: 15-01-2018, 08:55 AM -
BUILD LOG: Steel Frame, Aluminium Hybrid Design Thread
By f1sy in forum DIY Router Build LogsReplies: 0Last Post: 23-02-2016, 10:04 AM -
Steel vs Aluminium
By gavztheouch in forum Metalwork DiscussionReplies: 4Last Post: 26-05-2014, 10:11 PM



Reply With Quote
Bookmarks