Hybrid View
-
18-06-2020 #1
My solution is similar to Neale's. The UB1 board I use has a simple safety-relay circuit, so the first 10 or so inputs can be linked to close a relay. My driver's fault signals feed into this, alongside my VFD's fault signal and a signal from my e-stop circuit. The driver's enable line is linked to the relay output, so if one drive faults the drives remain powered but not enabled. Same happens if the VFD drops out, or I hit the e-Stop button (but that also has the effect of killing the power to the drivers directly).
Thread Information
Users Browsing this Thread
There are currently 1 users browsing this thread. (0 members and 1 guests)
Similar Threads
-
BUILD LOG: 8x4 router build. Steel base & Aluminium gantry gantry
By D-man in forum DIY Router Build LogsReplies: 57Last Post: 13-12-2019, 10:43 AM -
BUILD LOG: Design stage - All steel - 1200x750x110 - aluminium capable (hopefully)
By oliv49 in forum DIY Router Build LogsReplies: 3Last Post: 08-06-2018, 01:18 PM -
welding steel base or just getting aluminium extrusion
By reefy86 in forum Gantry/Router Machines & BuildingReplies: 200Last Post: 15-01-2018, 08:55 AM -
BUILD LOG: Steel Frame, Aluminium Hybrid Design Thread
By f1sy in forum DIY Router Build LogsReplies: 0Last Post: 23-02-2016, 10:04 AM -
Steel vs Aluminium
By gavztheouch in forum Metalwork DiscussionReplies: 4Last Post: 26-05-2014, 10:11 PM
Bookmarks