Threaded View
-
27-01-2020 #7
Re the VFD setup PD014...
I have mine set quite long as my entire shed, air-con included, runs off a single 16A breaker. It is then necessary to add a delay to the G-code for each job after the spindle start command to allow it time to run up before it starts cutting. I use a 6 second delay (G4 P6).An optimist says the glass is half full, a pessimist says the glass is half empty, an engineer says you're using the wrong sized glass.
Thread Information
Users Browsing this Thread
There are currently 3 users browsing this thread. (0 members and 3 guests)
Similar Threads
-
3040Z machine spindle upgrade/modification
By enterpryse in forum Chinese MachinesReplies: 13Last Post: 15-06-2020, 05:54 PM -
Upgrade to 3040T Machine Table/Bed, options?
By davitc in forum Gantry/Router Machines & BuildingReplies: 4Last Post: 30-01-2020, 11:57 AM -
Newbie Machine Build Log (Fancy Machine)
By Fancy in forum Gantry/Router Machines & BuildingReplies: 2Last Post: 18-09-2018, 06:15 PM -
Upgrade? Chinese CNC Machine
By Carlb1058 in forum Machine DiscussionReplies: 120Last Post: 15-08-2013, 09:04 AM -
Electronics upgrade for an existing machine.
By Shinobiwan in forum Electronic Project BuildingReplies: 9Last Post: 18-03-2012, 04:01 PM
Bookmarks