Thread: John's Alu Profile build
Threaded View
-
30-04-2020 #11
This morning two custom ballscrew nut mounts arrived from the CNC service, they came out really well so I followed on to test fit these and the newly welded (ahem) brackets.
With a little to and fro to swap parts out I'm glad to say it all fits as well as I can expect, and boy does the thing feel much more solid now.
I had to massage the brackets a little on the corner to give some wiggle room by adding chamfer the corner of the L to give a millimeter or two clearance.
I'm now just awaiting the new anti-backlash couplers to mate the motors to the new screws and this part should be done. It's been a bit of extra work, but so far I can feel the improvement and I'm glad that I took it on.
If everything goes smoothly then I'll be removing these steel brackets and adding some more internal welds just to beef them up a little before painting them black and refitting. I'll need to start designing the table soon, I may be back to get some advise from you all when I get around to that part.
Thread Information
Users Browsing this Thread
There are currently 1 users browsing this thread. (0 members and 1 guests)
Similar Threads
-
Aluminium profile cnc build
By valdis034 in forum Gantry/Router Machines & BuildingReplies: 84Last Post: 21-02-2023, 02:27 PM -
BUILD LOG: First Build - Yet Another Alu Profile Router - 900 x 800
By CaptainBarnacles in forum DIY Router Build LogsReplies: 53Last Post: 14-02-2020, 08:16 PM -
BUILD LOG: Large aluminium profile build
By jeronimo in forum DIY Router Build LogsReplies: 6Last Post: 12-11-2016, 10:02 PM -
BUILD LOG: New build - fixed gantry mill using extruded profile
By toolchimp in forum DIY Router Build LogsReplies: 3Last Post: 09-11-2012, 04:10 PM -
NEW MEMBER: John C, York, UK
By JohnC in forum New Member IntroductionsReplies: 1Last Post: 17-10-2010, 07:03 PM
Bookmarks