It's going to take a while!!! This dam lock down has me starved of materials. One of my main goals is to have flood coolant for this baby. I'm thinking about a fiberglass "Well" to cover the base just under the table to catch fluid. No idea how much this will cost as I have never delved into fiberglass before. There are several places in Dublin "All Closed" to get fiberglass materials. All going well I should be able to get something in a month or so. Plenty of time to design and build the other bits. Realistically I need to the the 3 axis setup running in order to make the 4th and 5th axis setup. Bit of chicken and egg at the moment. If I had of been clever( which I seldom am) I would of machined all the necessary parts BEFORE dismantling the working machine!!! DOHHHHHHH. Ooh well, thats the fun of it I guess. How is your base build coming along?