Threaded View
-
24-01-2021 #5
Full day on it yesterday.
I chopped down the main big steels to size. They are 3.55m long now which hopefully means i can get a full 10' sheet on the bed and have room to park the gantry over a linear ATC at the back of the machine.
We added some 80x80 steels in between the main cross beams to further support the router bed.
Then i went to work on the box section which will form the base to build off for the side Y rails. I did this in some 50x50x5 rhs box section. I mag drilled the section with 22mm holes on 3 sides of the steel and then band sawed through the corner between 2 of the holes. This is going to form a little access hole for some fixings. I also used it to plug weld the 3rd hole to the main large steels after getting it as level as possible.
Thread Information
Users Browsing this Thread
There are currently 1 users browsing this thread. (0 members and 1 guests)
Similar Threads
-
Downsizing
By CNCKitMan in forum Classified Ads, Buy, Sell & SwapReplies: 0Last Post: 14-12-2019, 12:07 PM -
Chinese 4 x 4 production grade machine - Brands names to look at it steer clear of?
By SweetAs in forum Chinese MachinesReplies: 16Last Post: 26-09-2018, 09:02 AM -
BUILD LOG: New Build - For Your Amusement - MK-2 build
By Karl in forum DIY Router Build LogsReplies: 12Last Post: 08-02-2017, 08:03 PM -
precision ground angle plates - quality brands?
By dsc in forum Tool & Tooling TechnologyReplies: 0Last Post: 30-01-2015, 06:14 PM
Bookmarks