Full day on it yesterday.

I chopped down the main big steels to size. They are 3.55m long now which hopefully means i can get a full 10' sheet on the bed and have room to park the gantry over a linear ATC at the back of the machine.

We added some 80x80 steels in between the main cross beams to further support the router bed.

Click image for larger version. 

Name:	IMG_0967.jpeg 
Views:	281 
Size:	1.24 MB 
ID:	29433

Then i went to work on the box section which will form the base to build off for the side Y rails. I did this in some 50x50x5 rhs box section. I mag drilled the section with 22mm holes on 3 sides of the steel and then band sawed through the corner between 2 of the holes. This is going to form a little access hole for some fixings. I also used it to plug weld the 3rd hole to the main large steels after getting it as level as possible.

Click image for larger version. 

Name:	IMG_0972.jpeg 
Views:	271 
Size:	900.1 KB 
ID:	29434

Click image for larger version. 

Name:	IMG_0974.jpeg 
Views:	257 
Size:	949.8 KB 
ID:	29435